Determine about the prestressed concrete

In prestressed concrete the most important parameter is the prestressing force. Ifthe prestressing force reduces with time, prestresses also get reduced.

Even at the time of the transfer of prestress to the concrete member, there is adrop of the prestressing force from the recorded value in the jack gauge. Variousreductions of the prestressing force are termed as the losses in prestress.

 


Related Discussions:- Determine about the prestressed concrete

Why are steel plates inserted inside bearings, In designing of elastomeric ...

In designing of elastomeric bearings, why are steel plates inserted inside Bearings?

What is the meaning of term - slip in anchorage, What is the meaning of ter...

What is the meaning of term -Slip in Anchorage In the case of post-tensioned concrete, when the tendons are anchored at the ends of concrete members, a slip of  tendons takes

CUBE STRENGTH, IN CASE CUBE IS FAIL WHAT CAN IDO

IN CASE CUBE IS FAIL WHAT CAN IDO

Poly tetra fluoro ethylene, Question Why Poly tetra fluoro ethylene (PTFE...

Question Why Poly tetra fluoro ethylene (PTFE) is usually used in sliding bearings? Answer The choice of sliding surface of bearings is of very important importance since slid

What is contact pressure, What is 'contact pressure'? How does it depend on...

What is 'contact pressure'? How does it depend on the type of structure and type of soil? What is 'active zone' in soil? Define it with reference to the pressure bulb concept.

Los angeles abrasion test, Los Angeles Abrasion Test: In which the agg...

Los Angeles Abrasion Test: In which the aggregates are placed in a rotating drum in which a certain number of cast iron cylindrical balls are also placed, and the drum rotated

Air infiltration, Using Matlab/ Simulink software, verify the heating requi...

Using Matlab/ Simulink software, verify the heating requirement (kW) for the building because of  air infiltration and natural ventilation. Note that this needs you to estimate air

Engineering economics, Ask quA contractor has both a 3-cy and a 5-cy shovel...

Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 worki

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd