Road drainage and maintenance, Civil Engineering

Assignment Help:

Road Drainage and Maintenance:

The life of a road depends upon how well and quickly the water is drained away from its various components. Similarly, regular and periodic inspection and maintenance of a road ensures that the facility lasts over a period it is designed for.

Objectives

After studying this unit, you should be able to :

  • understand the importance of drainage of roads,
  • know surface and subsurface drainage is achieved through side drains, intercepting drains, the subsurface pipe drains and cross-drainage structures, and
  • discuss the road maintenance, how the maintenance needs are assessed and how the maintenance of various types of roads is achieved.

 


Related Discussions:- Road drainage and maintenance

Building construction drawings, I need a drawing detail of expansion joints...

I need a drawing detail of expansion joints in building and different sizes

Mechanics, What is the parallelogram law of force and prove it?

What is the parallelogram law of force and prove it?

Geometric design of roads, Geometric Design Of Roads: Geometric design...

Geometric Design Of Roads: Geometric design of roads deals with elements such as cross-section, horizontal and vertical alignment, sight distances, lateral and vertical cleara

Keywords of road pavements, Keywords of Road Pavements: Pavement : T...

Keywords of Road Pavements: Pavement : That part of a road which structurally supports the vehicles travelling on a road. Flexible Pavement   : A layered system of pave

What are basic types of elastomeric bearings, Q. What are basic types of el...

Q. What are basic types of elastomeric bearings? Three basic types of elastomeric bearings are used. 1. Plain elastomeric pads 2. Steel reinforced elastomeric pads 3.

Principal stresses and strains, Principal Stresses and Strains: Princi...

Principal Stresses and Strains: Principal Stresses and Strains is a very important link in the analysis of solids so as to make sure safe design of different components of str

Define the precedence diagramming methods, Define the Precedence Diagrammin...

Define the Precedence Diagramming Methods a) Activity on Node (AON) with arrows for dependencies b) Uses all forms of precedence relationships

Continuous prestressed concrete beam design , Assignment:-Continuous Prestr...

Assignment:-Continuous Prestressed Concrete Beam Design A cast in-place 3-span prestressed concrete T-beam is to be designed. The T-beam concsists of an 8-in thick reinforced

Addition of water to bored piles, Addition of water to bored piles In ...

Addition of water to bored piles In water bearing ground, some water head (about 1 m) above the existing ground water table is sustained to stabilize the bore at the time of e

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd