Q. Reverse and direct circulation drill drilling in piling?
For reverse circulation drilling and direct circulation drilling, major difference in drilling method is connected to the direction of movement of drilling fluid. For direct circulation drilling, drilling fluid is circulated from the drill stem and then flows up annulus between the outside of drill stem and borehole wall. Drilling fluid which carries the drill cuttings flows to the surface and subsequent settlement pits. Pumps are used to lift the cuttings free fluid back to the drill stem.
For reverse circulation drilling, direction of flow of drilling flow is opposite to that of direct circulation drilling. Drilling fluid flows from the annulus amid the drill stem and hole wall to the drill stem. Drilling fluid is pumped to nearby sump pits where cuttings aredropped and settled.
can you do finite elements using the weighted residual formulation-galerkin method?
This assessment will test Learning Outcomes 3 and 4 as well as the component of Learning Outcome 1 as it refers to waste disposal for the Plumbing Technology. The student is expect
3-d figure of line ranger
Instruments used in chain survey
Question Why do BS8007 specify permissible crack width of water retaining structure as 0.2mm for severe, extremely severe exposure? Answer For break width less than
Q. Show the Direction of gunning in shotcreting? At the time of the construction of shotcrete, it is intended at gunning the full thickness in one single operation and this hel
Question Why are manhole covers finished of cast iron as same are through of ductile iron ? Answer Usually, manholes covers are made of cast iron. Though, in viewpoint of pipe
what is the allwoable combined aggregates Fineness Modulus
I retained the soil in my yard by brick with 3 levels to avoid sliding the soil to the street. the appeared part of the bricks from each level is 3 feet and less.The hidden part o
A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd