Reporting requirements for distribution licensees, Electrical Engineering

Assignment Help:

Reporting Requirements for Distribution Licensees

Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports and interruption reports. We shortly explain the requirements and formats of these reports.

The operational report on Generation Monitoring, Generating Plant Performance and Emission Monitoring has to be given on a monthly basis by the generating stations.

The commercial report has to be given through the distribution companies at the frequency display in the box ahead.

REPORT

FREQUENCY

 Load Distribution

 Bill Details

 Comparison of Actual and Estimated Demand

 Metered Data

 Un-metered Connection Details

 Data on Connections, disconnections and  reconnections

 Consumer Complaints

 Monthly

 Billing Cycle

 Monthly

 

 Billing Cycle

 Billing Cycle

 Monthly

 Monthly

Financial reports of the giving kind have to be presented annually:

              Report Title

 Fixed Assets (Plant & Machinery) (G,T,D)

 Depreciation of Fixed Assets (G,T,D)

 Statement of Profit (G,T,D)

 Capital Base (T,D)

 Loan Details (G,T,D)

 Major Investments (G,T,D)

 Fixed Assets (Plant & Machinery) (G,T,D)

 


Related Discussions:- Reporting requirements for distribution licensees

Transmission and swiching systems, using a combination of uniselectors and ...

using a combination of uniselectors and two motion selectors, draw a schematic of thousand line exchange and explain its working

Explain fourth group of 32 ascii character code, Explain Fourth group of 32...

Explain Fourth group of 32 ASCII character code? The fourth, and final, group of 32 ASCII character codes are set aside for the lower case alphabetic symbols, five additional

Zener diodes, At what value of electric field at a junction does zener brea...

At what value of electric field at a junction does zener breakdown takes place

Explain the signals hold and sid, Explain the signals HOLD, READY and SID ...

Explain the signals HOLD, READY and SID HOLD indicates that a peripheral such as DMA controller is requesting the use of address bus, data bus and control bus. READY is used to

Why biasing in necessary in transistor, (a) Describe why ordinary junction ...

(a) Describe why ordinary junction transistor is known as bipolar. (b) Describe working of NPN transistor as common Base configuration. Describe working of NPN transistor in

Instruction size , Instruction size As we  have seen already  that eac...

Instruction size As we  have seen already  that each instruction has two parts Opcode ( Operation  Code) Which  tells  the types  of operation  to be  performed .

Management of Initiatives and Focus - KPI, Management of Initiatives and Fo...

Management of Initiatives and Focus - KPI In this era of fierce competition and to have the competitive edge, it is significant to conserve the material and human resources th

Pop instruction, POP Instruction This instruction  copies the contents ...

POP Instruction This instruction  copies the contents  of the top  two locations  of the  stack into the  specified  register pair. The  contents  of stack pointer register are

Internalization of KPI Process, Internalization of KPI Process It is t...

Internalization of KPI Process It is the responsibility of management to ensure in which the focus of all the participants in performance management and KPI exercise is there

Identify the key cultural dimensions, This assessment requires you to refle...

This assessment requires you to reflect on an intercultural communication event that you have experienced between yourself and an Australian. a)  Describe the event without eval

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd