Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Reporting Requirements for Distribution Licensees
Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports and interruption reports. We shortly explain the requirements and formats of these reports.
The operational report on Generation Monitoring, Generating Plant Performance and Emission Monitoring has to be given on a monthly basis by the generating stations.
The commercial report has to be given through the distribution companies at the frequency display in the box ahead.
REPORT
FREQUENCY
Load Distribution
Bill Details
Comparison of Actual and Estimated Demand
Metered Data
Un-metered Connection Details
Data on Connections, disconnections and reconnections
Consumer Complaints
Monthly
Billing Cycle
Financial reports of the giving kind have to be presented annually:
Report Title
Fixed Assets (Plant & Machinery) (G,T,D)
Depreciation of Fixed Assets (G,T,D)
Statement of Profit (G,T,D)
Capital Base (T,D)
Loan Details (G,T,D)
Major Investments (G,T,D)
Q. Determine the open-circuit output voltage v o of the system shown in Figure as a function of the input voltage v i .
The five addressing modes are given below: Immediate, Register, Direct, Implied addressing modes Register indirect,
Discuss the role of a bus arbiter in a multiprocessor configuration. Bus arbiter: It functions to resolve priority among bus masters and permits only one device at a time to
voltage regulator using ic 741
Discuss the term D/A conversion. D/A conversion: Digital-to-analog or analog-to-digital conversions are two very significant aspects of digital data processing. Digital-to-
8 bit data to memory This form of the instruction is used to copy 8 bit data directly to the memory location pointed by register pair HL. The instruction format is
what do you mean by band in communication? how it differs from bandwidth?
Thermal considerations: At continuous current, the voltage across the emitter-base junction V BE of a bipolar transistor get decreases 2 mV (silicon) and 1.8mV (germanium) fo
difference between cmp and sub in microprocessor.
A 3-phase, wye-connected, 11.8 kV, 100 MVA turbo- generator of 0.8 power factor lagging has a synchronous reactance of 2.0 p.u. on rating. The generator is driven by a steam turbin
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd