Reporting requirements for distribution licensees, Electrical Engineering

Assignment Help:

Reporting Requirements for Distribution Licensees

Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports and interruption reports. We shortly explain the requirements and formats of these reports.

The operational report on Generation Monitoring, Generating Plant Performance and Emission Monitoring has to be given on a monthly basis by the generating stations.

The commercial report has to be given through the distribution companies at the frequency display in the box ahead.

REPORT

FREQUENCY

 Load Distribution

 Bill Details

 Comparison of Actual and Estimated Demand

 Metered Data

 Un-metered Connection Details

 Data on Connections, disconnections and  reconnections

 Consumer Complaints

 Monthly

 Billing Cycle

 Monthly

 

 Billing Cycle

 Billing Cycle

 Monthly

 Monthly

Financial reports of the giving kind have to be presented annually:

              Report Title

 Fixed Assets (Plant & Machinery) (G,T,D)

 Depreciation of Fixed Assets (G,T,D)

 Statement of Profit (G,T,D)

 Capital Base (T,D)

 Loan Details (G,T,D)

 Major Investments (G,T,D)

 Fixed Assets (Plant & Machinery) (G,T,D)

 


Related Discussions:- Reporting requirements for distribution licensees

Determine the resonant frequency and bandwidth, Q. A gyrator is sometimes u...

Q. A gyrator is sometimes used in integrated circuits to simulate inductances. Consider the circuit of Figure consisting of a gyrator. (a) Show that the impedance as seen to the

Determine the energy fluence - fluence rate, 1. The photon fluence rate is ...

1. The photon fluence rate is 10 7 photons mm -2 sec -1 for a beam of γ rays. One fourth of the photons have energies of 100 keV, one half have energies of 80 keV and the remain

Applications platform - gis applications, Applications Platform: GIS a...

Applications Platform: GIS applications should be capable to act as a base system over which the other business process application can be integrated which is the objective of

Signal and system, You are required to implement below shift system in MATL...

You are required to implement below shift system in MATLAB, t0 is the amount of shift towards left or right. y(t)= x(t-t0) Implement MATLAB code, where shift should be taken as

Explain the asynchronous decade counter, Explain the Asynchronous Decade Co...

Explain the Asynchronous Decade Counter? The binary counters earlier introduced have two to the power n states. But the counters with states less than this number are as well

Jfet ampli?er circuit, Q. For the CS JFET ampli?er circuit of Figure, R D ...

Q. For the CS JFET ampli?er circuit of Figure, R D = 2k and R L = 3k. The JFET with ro = 15 k has a voltage gain A v1 =-4.5 when the entire source resistance is bypassed. Fin

Multitasking - single processor many users many tasks , Multitasking -  Si...

Multitasking -  Single Processor Many Users Many  Tasks In multitasking or also  called  time sharing  systems  multi  user  more than  one users are sharing  one processor

What is open-loop voltage gain, Q. What is Open-loop voltage gain? The ...

Q. What is Open-loop voltage gain? The op amp amplifies the difference vd between the voltage on the noninverting (+) terminal and the inverting (-) terminal; see Figure. The t

What is the advantage of using jfet as an amplifier, Q. What is the advanta...

Q. What is the advantage of using JFET as an amplifier? As an amplifier of small time-varying signals, the JFET has a number of valuable assets. First of all it has a very high

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd