Reporting requirements for distribution licensees, Electrical Engineering

Assignment Help:

Reporting Requirements for Distribution Licensees

Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports and interruption reports. We shortly explain the requirements and formats of these reports.

The operational report on Generation Monitoring, Generating Plant Performance and Emission Monitoring has to be given on a monthly basis by the generating stations.

The commercial report has to be given through the distribution companies at the frequency display in the box ahead.

REPORT

FREQUENCY

 Load Distribution

 Bill Details

 Comparison of Actual and Estimated Demand

 Metered Data

 Un-metered Connection Details

 Data on Connections, disconnections and  reconnections

 Consumer Complaints

 Monthly

 Billing Cycle

 Monthly

 

 Billing Cycle

 Billing Cycle

 Monthly

 Monthly

Financial reports of the giving kind have to be presented annually:

              Report Title

 Fixed Assets (Plant & Machinery) (G,T,D)

 Depreciation of Fixed Assets (G,T,D)

 Statement of Profit (G,T,D)

 Capital Base (T,D)

 Loan Details (G,T,D)

 Major Investments (G,T,D)

 Fixed Assets (Plant & Machinery) (G,T,D)

 


Related Discussions:- Reporting requirements for distribution licensees

Determine the value of capacitance to give resonance, Determine the value o...

Determine the value of capacitance to give resonance: A circuit shown in Figure having a resistance of 5 Ω, an inductance of 0.4 H and a variable capacitance in series is conn

Matlap code, matlap code to solve the fast decoupled method

matlap code to solve the fast decoupled method

Explain time division switching, Explain time division switching? Tim...

Explain time division switching? Time  Division  Switching:   A  switching  element  can  be  shared  by  number  of concurrently  active  speech  circuits.  It is the princi

Transient behavior of a control system, Q. Transient behavior of a control ...

Q. Transient behavior of a control system? The transient portion of the time response of a stable control system is that part which goes to zero as time increases and becomes s

Description of clauses used in a parallel construct, Q. Description of clau...

Q. Description of clauses used in a parallel construct? When a thread comes across a parallel construct a set of new threads is made to execute parallel region. Inside the para

Magnetic circuits with air gaps, The creation of a magnetic field in a ring...

The creation of a magnetic field in a ring may need to be accessed by means of an air gap. This is typically used to apply the magnetic field to a current carrying conductor to pro

Analogue and digital, 1. Pattern recognition A synchronous sequential machi...

1. Pattern recognition A synchronous sequential machine is to generate 1 on output z after the next clock pulse whenever the bit sequence on input x has exactly two 0’s in the last

What is thermal runaway, Q. What is thermal runaway? State one method to pr...

Q. What is thermal runaway? State one method to prevent the same? The effect of changes in leakage current (ICO)  and current gain(b) on the dc bias point is given by the equat

Disadvantages - high level languages, Disadvantage - High  level  Langua...

Disadvantage - High  level  Languages a.Computational time is more as compared to  machine languages. b.Requires more  memory. c.Requires the knowledge of specific rules

Transmission and distribution losses - electrical energy, Transmission And ...

Transmission And Distribution Losses - Electrical Energy Previously, you have learnt that there are inherent losses in transmission and distribution of electrical energy from

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd