Reporting Requirements for Distribution Licensees
Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports and interruption reports. We shortly explain the requirements and formats of these reports.
The operational report on Generation Monitoring, Generating Plant Performance and Emission Monitoring has to be given on a monthly basis by the generating stations.
The commercial report has to be given through the distribution companies at the frequency display in the box ahead.
REPORT
FREQUENCY
Load Distribution
Bill Details
Comparison of Actual and Estimated Demand
Metered Data
Un-metered Connection Details
Data on Connections, disconnections and reconnections
Consumer Complaints
Monthly
Billing Cycle
Financial reports of the giving kind have to be presented annually:
Report Title
Fixed Assets (Plant & Machinery) (G,T,D)
Depreciation of Fixed Assets (G,T,D)
Statement of Profit (G,T,D)
Capital Base (T,D)
Loan Details (G,T,D)
Major Investments (G,T,D)
What is superposition?
Ask question #Madvantages of 4 bit binary adder inimum 100 words accepted#
Consumer Interaction and Service Standards These KPIs deal along with the customer, internal business procedures and change management. These are significant to give the desir
Q. Explain the different coupling schemes used in amplifiers? When amplifiers are cascaded, it is necessary to use a coupling network between the output of one amplifier and th
Load Stack Pointer This instruction loads the stack pointer register with the 16 - bit data specified in the instruction. The 16 - bit data. When stored in sp registe
Q. The inductance per unit length in H/m for parallel-plate infinitely long conductors in air is given by L = µ 0 d/w = 4π×10 -7 d/w, where d and w are inmeters. Compute L (per un
Q. Required Conditions for connecting two transformers in parallel? Ans: a) Voltage rating should be same b) Per unit impedance should be same c) Phase sequence should
discussion for experiment
List the uses of USART. USART- Universal Synchronous Asynchronous Receiver-Transmitters. It is used to transmit and receive the data in serial communication mode. It is
Explain AAS instructions in 8086 family with example and their effect on flag. AAS: it is stands for ASCII adjust after subtraction; this is used to adjust the AX register l
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd