Reporting Requirements for Distribution Licensees
Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports and interruption reports. We shortly explain the requirements and formats of these reports.
The operational report on Generation Monitoring, Generating Plant Performance and Emission Monitoring has to be given on a monthly basis by the generating stations.
The commercial report has to be given through the distribution companies at the frequency display in the box ahead.
REPORT
FREQUENCY
Load Distribution
Bill Details
Comparison of Actual and Estimated Demand
Metered Data
Un-metered Connection Details
Data on Connections, disconnections and reconnections
Consumer Complaints
Monthly
Billing Cycle
Financial reports of the giving kind have to be presented annually:
Report Title
Fixed Assets (Plant & Machinery) (G,T,D)
Depreciation of Fixed Assets (G,T,D)
Statement of Profit (G,T,D)
Capital Base (T,D)
Loan Details (G,T,D)
Major Investments (G,T,D)
hydroelectric power station
Q. What is meant by biasing transistor? The purpose of dc biasing of transistor is to obtain a certain dc collector current at a certain dc collector voltage. These values of c
UJT as a relaxation oscillator The UJT is a highly efficient switch it is used as trigger a device for SCR. No sinusoidal oscillators saw tooth generators phase contro
a. With neat circuit diagram and frequency response curve define the two stages RC coupled amplifier. What are its benefits and applications? b. Sketch ideal and the actual resp
2+7
Q. If the output signal fromanAMmodulator is given by u(t) = 5 cos 1800 πt + 20 cos 2000 πt + 5 cos 2200 πt , determine: (a) The modulating signal m(t) and carrier c(t). (b)
A 3-phase transmission line is 200km long. The line has a per phase series impedance of 0.25+j0.45 Ω/km and shunt admittance of j7.2 μS/km. The line delivers 250MVA, at 0.6 lagging
Operation of heterodyne wave analyzer with block diagram
FET operation: Figure: I-V characteristics and output plot of a JFET n-channel transistor. The FET manages the flow of electrons (or electron holes) from the sourc
The mathematical relationships of control systems are usually represented by block diagrams, which show the role of various components of the system and the interaction of variable
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd