Reporting Requirements for Distribution Licensees
Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports and interruption reports. We shortly explain the requirements and formats of these reports.
The operational report on Generation Monitoring, Generating Plant Performance and Emission Monitoring has to be given on a monthly basis by the generating stations.
The commercial report has to be given through the distribution companies at the frequency display in the box ahead.
REPORT
FREQUENCY
Load Distribution
Bill Details
Comparison of Actual and Estimated Demand
Metered Data
Un-metered Connection Details
Data on Connections, disconnections and reconnections
Consumer Complaints
Monthly
Billing Cycle
Financial reports of the giving kind have to be presented annually:
Report Title
Fixed Assets (Plant & Machinery) (G,T,D)
Depreciation of Fixed Assets (G,T,D)
Statement of Profit (G,T,D)
Capital Base (T,D)
Loan Details (G,T,D)
Major Investments (G,T,D)
Add the Contents of Register This instruction is used to add the contents of register R with the contents of accumulator and result of operation is stored in the accumu
The very basic specifications of a UJT are: Vbb(max) - The maximum interbase voltage that can be applied to the UJT (b) Rbb-the interbase resistance of the UJT (c) n - The
Three byte instruction The instruction which have 16 bit data address as its operand are three byte instruction. They need three memory locations to store them in m
Is there any electronics related papers like digital for free download
Explain the discovery of neutron. Mention its properties. Discovery of Neutron: The existence of neutron was first predicted by Rutherford in the year 1920. But it was discov
Testing of CT Operated Meters The subsequent tests should be carried out for CT operated meters: i) Ratio test through primary injection kit, ii) Polarity test, iii)
Q. An 8-bit A/D converter is driven by a 1-MHz clock. Estimate the maximum conversion time if: (a) It is a counter-controlled A/D converter. (b) It is a successive-approximat
A symmetrical fluctuating message, with |f(t)| max = 6.3 V and KCR = 3, is to be encoded by using an encoder that employs an 8-bit natural binary code to encode 256 voltage levels
multiplexer,
FET Parameters A basic, low-frequency hybrid-pi model for the MOSFET is displayed in figure. The several parameters are as follows. is the transconductance in siemens
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd