Reporting requirements for distribution licensees, Electrical Engineering

Assignment Help:

Reporting Requirements for Distribution Licensees

Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports and interruption reports. We shortly explain the requirements and formats of these reports.

The operational report on Generation Monitoring, Generating Plant Performance and Emission Monitoring has to be given on a monthly basis by the generating stations.

The commercial report has to be given through the distribution companies at the frequency display in the box ahead.

REPORT

FREQUENCY

 Load Distribution

 Bill Details

 Comparison of Actual and Estimated Demand

 Metered Data

 Un-metered Connection Details

 Data on Connections, disconnections and  reconnections

 Consumer Complaints

 Monthly

 Billing Cycle

 Monthly

 

 Billing Cycle

 Billing Cycle

 Monthly

 Monthly

Financial reports of the giving kind have to be presented annually:

              Report Title

 Fixed Assets (Plant & Machinery) (G,T,D)

 Depreciation of Fixed Assets (G,T,D)

 Statement of Profit (G,T,D)

 Capital Base (T,D)

 Loan Details (G,T,D)

 Major Investments (G,T,D)

 Fixed Assets (Plant & Machinery) (G,T,D)

 


Related Discussions:- Reporting requirements for distribution licensees

Explain about communication systems, Q. Explain about Communication Systems...

Q. Explain about Communication Systems? Even though most modern communication systems have only been invented and developed during the eighteenth and nineteenth centuries, it i

Limitor, What is limitor.. how it works

What is limitor.. how it works

Power mosfet - power semiconductor devices , Power MOSFET MOSFET stands...

Power MOSFET MOSFET stands  for metal oxide semiconductor fields  effect transistor.  A power  MOSFET has  three  terminal  drain source  and  gate,. It  is unipolar device  me

Find how long the bulb can be lighted, Q A12-V, 115-Ah automobile storage b...

Q A12-V, 115-Ah automobile storage battery is used to light a 6-W bulb. Assuming the battery to be a constant-voltage source, find how long the bulb can be lighted before the batte

Show how conservation of power is satisfied by the circuit, Q. Show how the...

Q. Show how the conservation of power is satisfied by the circuit of Figure.

Explain working of encoders, Explain working of Encoders? Encoding is t...

Explain working of Encoders? Encoding is the process of forming an encoded representation of a set of inputs, and it is the converse of the decoding operation. An encoder is a

What is meant by blanking, a. Explain the following terms: (6) (i) Persi...

a. Explain the following terms: (6) (i) Persistence of vision (ii) Flicker in motion pictures b. What is meant by blanking? What is the need of blanking pulses? Compare th

Current flow through the channel of a jfet after pinch off, Q. How does cur...

Q. How does current flow through the channel of a JFET after pinch off? It is seen that above the pinch off voltage at a constant value of VDS (saturation drain current, ID inc

Determine the kva rating of the synchronous motor, An induction motor takes...

An induction motor takes 350 kW at 0.8 power factor lagging while driving a load. When an overexcited synchronous motor taking 150 kW is connected in parallel with the induction mo

What are macros, What are Macros? Macro is a group of instruction. The ...

What are Macros? Macro is a group of instruction. The macro assembler makes the code in the program each time where the macro is called. Macros are described by MACRO & ENDM di

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd