Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Reporting Requirements for Distribution Licensees
Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports and interruption reports. We shortly explain the requirements and formats of these reports.
The operational report on Generation Monitoring, Generating Plant Performance and Emission Monitoring has to be given on a monthly basis by the generating stations.
The commercial report has to be given through the distribution companies at the frequency display in the box ahead.
REPORT
FREQUENCY
Load Distribution
Bill Details
Comparison of Actual and Estimated Demand
Metered Data
Un-metered Connection Details
Data on Connections, disconnections and reconnections
Consumer Complaints
Monthly
Billing Cycle
Financial reports of the giving kind have to be presented annually:
Report Title
Fixed Assets (Plant & Machinery) (G,T,D)
Depreciation of Fixed Assets (G,T,D)
Statement of Profit (G,T,D)
Capital Base (T,D)
Loan Details (G,T,D)
Major Investments (G,T,D)
Register Addressing In this mode the operand are microprocessors registers only i, e the operations is performed within various registers of the microprocessors only.
Illustrate the conventional representations of the following guide to the selection of Fits: (i) Slack Running Fit (ii) Loose Running Fit (iii) Easy Running Fit (iv) No
how is it possible to operate Q3 with no dc drain? where is the dc operating point?
principal and working of analog Storage Oscilloscope
Consider the network shown in Figure containing a voltage-controlled source producing the controlled current i c = gv, where g is a constant with units of conductance, and the con
Draw and discuss power failure detection circuit interrupt NMI. The non-maskable interrupt (NMI) is an edge-triggered input which requests can interrupt upon the positive-edge.
Draw the memory map of TPA in a personal computer and explain different areas. The transient program area holds the DOS operating system and other programs which control the co
Modern complex systems are normally constructed by interconnecting sub-units. Therefore the systems engineer is often not too concerned about the details of what is inside these
Ask question #Minwhat is biasing of clamper imum 100 words accepted#
INS Increment Register Pair Instruction Contents of the registers pair R P will be incremented by one and the result will be stored in the same register pair. It is
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd