Reporting requirements for distribution licensees, Electrical Engineering

Assignment Help:

Reporting Requirements for Distribution Licensees

Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports and interruption reports. We shortly explain the requirements and formats of these reports.

The operational report on Generation Monitoring, Generating Plant Performance and Emission Monitoring has to be given on a monthly basis by the generating stations.

The commercial report has to be given through the distribution companies at the frequency display in the box ahead.

REPORT

FREQUENCY

 Load Distribution

 Bill Details

 Comparison of Actual and Estimated Demand

 Metered Data

 Un-metered Connection Details

 Data on Connections, disconnections and  reconnections

 Consumer Complaints

 Monthly

 Billing Cycle

 Monthly

 

 Billing Cycle

 Billing Cycle

 Monthly

 Monthly

Financial reports of the giving kind have to be presented annually:

              Report Title

 Fixed Assets (Plant & Machinery) (G,T,D)

 Depreciation of Fixed Assets (G,T,D)

 Statement of Profit (G,T,D)

 Capital Base (T,D)

 Loan Details (G,T,D)

 Major Investments (G,T,D)

 Fixed Assets (Plant & Machinery) (G,T,D)

 


Related Discussions:- Reporting requirements for distribution licensees

Compute the electrostatic potential solution, Figure shows the cross-sectio...

Figure shows the cross-section of an electrostatic problem with translational symmetry: a rectangular coaxial cable. The inner conductor is held at 10 volts and the outer conductor

Find the required kva rating of a synchronous capacitor, An industrial plan...

An industrial plant consumes 500 kWat a lagging power factor of 0.6. (a) Find the required kVA rating of a synchronous capacitor to improve the power factor to 0.9. (b) If a

2365 - 305 task a, List four sources of information which are essential to ...

List four sources of information which are essential to the designer of this electrical installation.

Describe the process control instructions, Describe the process control ins...

Describe the process control instructions STC - It sets the carry flag & does not affect any other flag  CLC - it resets the carry flag to zero &does not affect any other fl

FET operation, ON output plot of a JFET n-channel transistor if ID is close...

ON output plot of a JFET n-channel transistor if ID is close to IDSS does the value of VGS close to VP?

Can you explain about slew rate, Q. Can you explain about Slew Rate? Sl...

Q. Can you explain about Slew Rate? Slew (or slewing) rate is a measure of how fast the output voltage can change. It is given by the maximum value of dvo/dt , which is normall

Detection and handling of gas leakage, Detection and Handling of Gas Leakag...

Detection and Handling of Gas Leakage : If you are using a toxic gas or have a store for it you must have some devices to indicate the leakage, if any. Though numerous monitoring

Connection of shunt capacitors - vantage points, Connection of Shunt Capaci...

Connection of Shunt Capacitors - Vantage Points An unloaded distribution line is capacitive in character and a fully loaded line has inherent inductive and resistive features

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd