Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Reporting Requirements for Distribution Licensees
Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports and interruption reports. We shortly explain the requirements and formats of these reports.
The operational report on Generation Monitoring, Generating Plant Performance and Emission Monitoring has to be given on a monthly basis by the generating stations.
The commercial report has to be given through the distribution companies at the frequency display in the box ahead.
REPORT
FREQUENCY
Load Distribution
Bill Details
Comparison of Actual and Estimated Demand
Metered Data
Un-metered Connection Details
Data on Connections, disconnections and reconnections
Consumer Complaints
Monthly
Billing Cycle
Financial reports of the giving kind have to be presented annually:
Report Title
Fixed Assets (Plant & Machinery) (G,T,D)
Depreciation of Fixed Assets (G,T,D)
Statement of Profit (G,T,D)
Capital Base (T,D)
Loan Details (G,T,D)
Major Investments (G,T,D)
using a combination of uniselectors and two motion selectors, draw a schematic of thousand line exchange and explain its working
Explain Fourth group of 32 ASCII character code? The fourth, and final, group of 32 ASCII character codes are set aside for the lower case alphabetic symbols, five additional
At what value of electric field at a junction does zener breakdown takes place
Explain the signals HOLD, READY and SID HOLD indicates that a peripheral such as DMA controller is requesting the use of address bus, data bus and control bus. READY is used to
(a) Describe why ordinary junction transistor is known as bipolar. (b) Describe working of NPN transistor as common Base configuration. Describe working of NPN transistor in
Instruction size As we have seen already that each instruction has two parts Opcode ( Operation Code) Which tells the types of operation to be performed .
Management of Initiatives and Focus - KPI In this era of fierce competition and to have the competitive edge, it is significant to conserve the material and human resources th
POP Instruction This instruction copies the contents of the top two locations of the stack into the specified register pair. The contents of stack pointer register are
Internalization of KPI Process It is the responsibility of management to ensure in which the focus of all the participants in performance management and KPI exercise is there
This assessment requires you to reflect on an intercultural communication event that you have experienced between yourself and an Australian. a) Describe the event without eval
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd