In general situation, reinforcement isn't essential for thrust blocks in pressurized pipelines. Though certain amount of reinforcement hasto be added in thrust blocks in the below situations:

(i) The structure integrity of huge thrust block could be improved by the introduction of reinforcement.

(ii) At the anchorages for straps in thrust blocks, some reinforcement has to be designed to evade the development of tensile stresses.


Related Discussions:- Reinforcement in thrust blocks

What is admixtures, Q. What is Admixtures? These are the substance whic...

Q. What is Admixtures? These are the substance which are added to the concrete to improve its qualities either its placing or in its subsequent performance. An admixture may be

Simulink software, Using Matlab/ Simulink software to model the overall bui...

Using Matlab/ Simulink software to model the overall building fabric heat transmit characteristics, in order to estimate the maximum rate of heat loss (kW) from the building under

Increase in velocity of water due to afflux, Q. Increase in velocity of wat...

Q. Increase in velocity of water due to afflux? Specific energy E f in m per m 3 of flow is the energy measured with respect to bottom and hence comprising potential head D a

Compute the maximum allowable concentrated live load, Given for the section...

Given for the section shown in Figure, M * = 250 kNm, f sy = 500 MPa and f c ′ = 25 MPa. Compute A st and (if necessary) A sc . You may assume that eac

Strength of Materials , Need to know about compressive strength test and te...

Need to know about compressive strength test and tensile strength test of cement

Determine the common ways to present the project schedule, Common ways to p...

Common ways to present the project schedule include all except: a. Gantt charts b. Milestone charts c. PERT charts D. Project Network Diagrams with dates added   So

Calculate the amount of import or export, Calculate the Amount of Import or...

Calculate the Amount of Import or Export For the project site shown in Figure, the amount of import or export to bring the entire site to elevation 90-ft is most nearly:

Geology class, I want to get answer of each questions that I Have in a sep...

I want to get answer of each questions that I Have in a separate paragraphs, and the information should be from sources so please fro each question that you answer write after it t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd