Reinforcement in thrust blocks, Civil Engineering

Assignment Help:

Reinforcement in thrust blocks

In general situation, reinforcement isn't essential for thrust blocks in pressurized pipelines. Though certain amount of reinforcement hasto be added in thrust blocks in the below situations:

(i) The structure integrity of huge thrust block could be improved by the introduction of reinforcement.

(ii) At the anchorages for straps in thrust blocks, some reinforcement has to be designed to evade the development of tensile stresses.


Related Discussions:- Reinforcement in thrust blocks

Maintenance of drainage and shoulders, Maintenance of Drainage: Maint...

Maintenance of Drainage: Maintenance of drainage will ensure that the run-off is taken away from the runway efficiently. The side ditches and buried pipes should be cleaned r

Difference between normal bolts and high friction grip bolts, Question ...

Question What is key difference between normal bolts and high friction grip bolts ? Answer High friction grip bolts are usually used in structural steelwork. They i

Define ways of providing the anti slip device - by embedment, Define Ways o...

Define Ways of providing the anti slip device - By Embedment? A recess can be created in the bed block in which the elastomeric pad will be placed. The functioning of the reces

Determine the hydraulic radius for rectangular open channel, Determine the ...

Determine the hydraulic radius R for a rectangular open channel with dimensions of 6 ft wide and 4 ft high (side walls) flowing at a depth of 3 ft. Solution: R = A/P Cross-s

Doors and windows, what are the actuall windows and door dimensions e.g AN ...

what are the actuall windows and door dimensions e.g AN ND4

Load transfer mechanism, Question What is load transfer mechanism for p...

Question What is load transfer mechanism for paving blocks in pedestrian footway? Answer In Hong Kong, footway is as a rule designed with paving slabs or interlocking b

Determine the grade rod reading at station, A section view of a proposed ro...

A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft

Career, does felid scope in civil eng. if we start consiltancy job

does felid scope in civil eng. if we start consiltancy job

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd