Q. Sand layer vs. cement sand used as bedding of precast concrete paving units
Cement sand is a mixture of sand and cement and it behaves as a cohesive mass once mixed. Usually a 20mm to 30mm sand layer is laid beneath precast paving block units. Though in locations of steep gradients where it stands a high possibility that rain runoff will wash out in filling sand and sand layers, cement sand should be sued instead. Correspondingly when high pressure jetting is anticipated to be used frequently in routine maintenance, sand layers beneath precast paving block units isn't preferable due to the reason of potential washing out of sand.
i need simple ans for this question tell me precaution of dampness
which kind of pile can increase the bearing capacity, if the water level high in sang soil surface?
Q. Residual stresses in steel after welding? Considerable residual stresses are persuaded in connecting steel members after welding operation. Local temperature of steel where
Principal Stresses and Strains: Principal Stresses and Strains is a very important link in the analysis of solids so as to make sure safe design of different components of str
Define about the Inclined Borings Inclined brings may also be used in exploration of inclined strata and for the detection of weak pockets (lenses), buried channels, caviti
You have been selected to assist the structural engineer for a bridge replacement project. Your task is to design the size of the footing for an interior bridge pier, based on the
A wastewater plant is operating at 10MGD with a suspended solids concentration of 200mg/L. It has 6 clarifiers operating in parallel. Each clarifier is 40 foot in diameter and 10 f
Soil at a borrow area has a total unit weight of 120-PCF and a water content of 15 percent. The soil from the borrow area will be used as structural fill and compacted to an avera
Describe the two fundamental purposes of surveying
Parallel Pipe Systems or Multipath Pipeline Problems Two or more sections of piping (branches) of different diameters, lengths and/or pipe materials originating and terminating
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd