QuestionIt should be necessary that raking piles of a bridge abutment be placed under an embankment?
AnswerFor a bridge abutment to be supported on raking piles with diverse orientations, movement between ground and pile group is difficult to guess. For instance, if some of raking piles of bridge abutment are extended beneath an embankment, then settlement of embankment behind abutment may cause raking piles to experience severe flexible moment and break piles as recommended by Dr. Edmund C Hambly in 1979.
Explain the Equation for Length of Spiral Curve Length of Spiral Curve can be calculated using the following equation L s = 3.15V 3 /RC Where: V - Design Speed in MPH
Solve the following three questions of the beam ABCD. Note that A is a fixed end; B is apin connection; C is a roller support; and D is a free end. 1) Sketch the quantitative
Q. Illustrate the Design discharge for foundation? To provide for an adequate margin of safety, the foundation and protective works of a bridge should be designed for a flood d
fabrication methods of ironmongery
A concrete wall form tie with an ultimate strength capacity of 2,400-lbs is designed for use in a concrete wall form with an 18-in center to center spacing. During formwork inspect
construction & working of rope brake dynamometr
Explain the System Curves - Pumping System Non-linear plot beginning on the y-axis at the Total Static Head (TSH) and plotted primarily based on the h f .
Ground settlement occurs when pipe-jacking machine enters mixed ground with soils and boulders? The rate of cutting through soils is faster than cutting through boulders for pi
Pavement Layers And Their Functions Flexible Pavement A typical modern flexible pavement for high traffic is composed of layers as under (Figure). Figure: L
With a clear sketch indicate the system of protection of line for works of short duration where ‘ Stop dead restriction' need to be observed on a single line section on a BG track.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd