Protection of lorry on the line, Civil Engineering

Assignment Help:

i. On single line by one or two men as required following and proceeding the lorry at a distance of 600 m. on the BG and 400 m. on the MG & NG carrying a banner flag across the track and another man plainly showing a stop hand signal at a distance of not less then 1200 m. on the BG and 800 m. on the MG & NG from the lorry on either side.

ii. Each man shall be provided with detonators and place three on the line 10 m. apart immediately the lorry comes to a stand & fix the Banner flag across the track.

iii. In all cases where flag man in advance or in rear can not be kept in view from the lorry additional intermediate flag man shall be posted to relay the signals.


Related Discussions:- Protection of lorry on the line

Large catchments in estimating peak runoff, Question Is it true that ra...

Question Is it true that rational process has to not be used for large catchments in estimating peak runoff ? Answer Rational process is appropriate for small catchme

Define analytical methods approved under the clean water act, Define Analyt...

Define Analytical Methods Approved Under the Clean Water Act? Analytical Methods Approved Under the Clean Water Act CWA Section 304(h) needs EPA to publish test procedures (ana

Concrete cover to enhance fire resistance, Q. Concrete cover to enhance fir...

Q. Concrete cover to enhance fire resistance? In the event of exposing concrete structures to a fire, a temperature gradient is established across the cross section of concrete

BESHOOOOO, what are the dimensions of a sheet of paper required for plottin...

what are the dimensions of a sheet of paper required for plotting a traverse ABCDE with 1 : 250 scale if a margin of 4 cm to the right and left sides and a6 cm margin to the other

Computer programming, compare 2 numbers and print either the message identi...

compare 2 numbers and print either the message identifying the greater than number(or) the message starting that both number are equal

Plants aeration period, Plants aeration period: Problem: What i...

Plants aeration period: Problem: What is the plant's aeration period? Solution The plant's aeration period is the number of hours that the wastewater is aerated

Explain forty-five degree spread rule for driven piles, Q. Explain Forty-fi...

Q. Explain Forty-five degree spread rule for driven piles ? For driven piles the length of piles driven into the ground is generally based on dynamic driving formula such as Hi

Deck that you can park a car under, I wish to build a deck that is 4.7m wid...

I wish to build a deck that is 4.7m wide and 7m long alongside my house. I need to park a car under it so there can be no supports in the middle. Attached to the wall on one side a

Role of rebate in typical construction joint, Question What is role of reba...

Question What is role of rebate in typical construction joint ? Answer Construction joints are formed on sites to facilitate construction procedure. Though, if improperly constr

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd