i. On single line by one or two men as required following and proceeding the lorry at a distance of 600 m. on the BG and 400 m. on the MG & NG carrying a banner flag across the track and another man plainly showing a stop hand signal at a distance of not less then 1200 m. on the BG and 800 m. on the MG & NG from the lorry on either side.
ii. Each man shall be provided with detonators and place three on the line 10 m. apart immediately the lorry comes to a stand & fix the Banner flag across the track.
iii. In all cases where flag man in advance or in rear can not be kept in view from the lorry additional intermediate flag man shall be posted to relay the signals.
Question Is it true that rational process has to not be used for large catchments in estimating peak runoff ? Answer Rational process is appropriate for small catchme
Define Analytical Methods Approved Under the Clean Water Act? Analytical Methods Approved Under the Clean Water Act CWA Section 304(h) needs EPA to publish test procedures (ana
Q. Concrete cover to enhance fire resistance? In the event of exposing concrete structures to a fire, a temperature gradient is established across the cross section of concrete
what are the dimensions of a sheet of paper required for plotting a traverse ABCDE with 1 : 250 scale if a margin of 4 cm to the right and left sides and a6 cm margin to the other
compare 2 numbers and print either the message identifying the greater than number(or) the message starting that both number are equal
Plants aeration period: Problem: What is the plant's aeration period? Solution The plant's aeration period is the number of hours that the wastewater is aerated
Q. Explain Forty-five degree spread rule for driven piles ? For driven piles the length of piles driven into the ground is generally based on dynamic driving formula such as Hi
I wish to build a deck that is 4.7m wide and 7m long alongside my house. I need to park a car under it so there can be no supports in the middle. Attached to the wall on one side a
finite elements
Question What is role of rebate in typical construction joint ? Answer Construction joints are formed on sites to facilitate construction procedure. Though, if improperly constr
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd