Program for multiply verb, COBOL Programming

Assignment Help:

PROGRAM FOR MULTIPLY VERB:

We have to write a simple program to elaborate MULTIPLY verb. You can also use the edit characters in the program.

Identification division.

Program- id. Mulverb.

Environment division.

Data division.

Working-storage section.

77  a  pic  s9(3)v9(2) value 0.

77   b  pic   s9(3)v9(2) value 0.

77   c pic    s9(4)v9(2) value 0.

77   e-c pic  -z(4).z(2).

Procedure division.

Para-1.

 Display(1 1) erase.

 Display(3 5) "Enter first number :".

 Accept a.

 Display(5 5) "Enter second number :".

 Accept b.

 Multiply a by b giving  c.

 Move c to e-c.

  Display(15 5) "Product = " e-c.

  Stop run.

Description:   This program gets 2 inputs from the user.

                      It multiplies them by using the MULTIPLY verb. 

                      a*b is found and stored in c.

                      The unedited result is accessible in c.

                      We move c to e-c, where the edit characters are accessible.

                      Keep in mind that the variable e-c makes use of the - edit character.

                       The e-c will always be exhibited with result. 


Related Discussions:- Program for multiply verb

Record description for the variable-length records, Record Description for ...

Record Description for the Variable-length Records: When the variable- length records consists of records of various lengths, each record type is to be explained at level 01 f

Rewrite statement - relative files, REWRITE STATEMENT: The REWRITE st...

REWRITE STATEMENT: The REWRITE statement has the format for a relative file as shown below, REWRITE record-name  [ FORM identifier ]

Rules of redefines clause, RULES OF REDEFINES CLAUSE The rules shown be...

RULES OF REDEFINES CLAUSE The rules shown below govern the use of the REDEFINES clause: (i) The level-number of data-name-1 and data-name-2 should be identical. (ii) Exce

Example of class condition, Example of Class condition: Let the BASIC-...

Example of Class condition: Let the BASIC-PAY be a data name in the card record defined with picture 9(5) V99. By reading the card we can test the value of the BASIC-PAY to ma

#Array, Major difference between file and array how does record read from a...

Major difference between file and array how does record read from array and file why we are not preparing array for real time

Example of constructing an arithmetic expression, Example of constructing a...

Example of constructing an arithmetic expression: An arithmetic expression may be proceeded by a + or - sign. These operations are known as unary + or unary - operators. Il

Difference between index and subscript, What is the difference b/w index an...

What is the difference b/w index and subscript? Subscript indicates to the array occurrence whereas index is the displacement (in no of bytes) from the beginning of the array.

Program for inventory , PROGRAM FOR INVENTORY  We have to write a progr...

PROGRAM FOR INVENTORY  We have to write a program to update the inventory file. Consider 2 files,viz, invfile an tranfile. Invfile has 3 fields pno,name,qty. Tranfile has 3 fil

Program., calculate simple interest

calculate simple interest

Illustration of perform statement, Illustration of perform statement: ...

Illustration of perform statement: PERFORM    CALCUALTE-TAX. In this illustration, the CALCULATE-TAX is either a section name or paragraph name. Assume that it is a section

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd