Prepaid meters, Electrical Engineering

Assignment Help:

Prepaid Meters

Prepaid metering is a system whereby consumers purchase electricity by a smart card. The amount paid together along with other information is encoded in the smart card. In sequence to transfer the credit, the consumer inserts the card within the meter. The meter reads the data and whiles the paid for energy has been exhausted, the consumer gets the card reloaded/ reprogrammed. The system has the ability of programming along with time of use tariffs, multiple rates and etc.

The use of prepaid meters results in almost total elimination of non- payment and delayed payment and enables transfer of reliable, correct and up to date consumption and billing data according to tariff policy in use. This information can be utilized by the utility for demand forecasting and for controlling peak demands. It also means substantial reduction in staff for meter reading, bill complaints, bill serving, and bad debts, etc. Full meter programmability allows maximum flexibility in changing tariffs. Consumer can also decide in advance the affordable level of expenditure, which helps him and the utility in elimination of disputes regarding inaccurate bills.


Related Discussions:- Prepaid meters

#bode plots.., #how to draw bode plots for a transfer function

#how to draw bode plots for a transfer function

Determine the dimensions of the new model, The manufacturers of the tank de...

The manufacturers of the tank described in Problem would like to  design another model, with twice the capacity of the one described in figure. The ratio of height to diameter must

Illustrate transformer coupling, Q. Illustrate Transformer coupling? In...

Q. Illustrate Transformer coupling? In this method the primary winding of the transformer acts as a collector load and the secondary winding transfers the a.c. output signal di

Explain about darlington amplifier, Q Explain about 'Darlington Amplifier'?...

Q Explain about 'Darlington Amplifier'? DARLINGTON AMPLIFIER : A CC stage followed by another CC stage has an input resistance of about (b + 1) 2 times the emitter resistance

Bode plot phase ad gain margin, Using Bode plot calculate (a) Phase margin ...

Using Bode plot calculate (a) Phase margin (b) Gain margin (c) Stability of closed loop system. The open transfer function of the system is t=30/(s+2)/(s+3)Using Bode plot calcula

Compute the real power inductive load, Q. A 60-Hz, 440-V, three-phase syste...

Q. A 60-Hz, 440-V, three-phase system feeds two balanced wye-connected loads in parallel. One load has a per-phase impedance of 8 + j3  and the other 4 - j1 . Compute the real po

Design an electro-pneumatic system, (i) Sketch a fully-labelled electro-pne...

(i) Sketch a fully-labelled electro-pneumatic circuit showing your actuators in the START position and employ metered out speed control with mono-stable 5/2 DCV's having solenoid a

What is 16-bit isa, What is 16-bit ISA? Compare it with 8-bit ISA bus. ...

What is 16-bit ISA? Compare it with 8-bit ISA bus. The only difference among the 8 and 16-bit ISA bus is that other connector is attached behind the 8-bit connector. This 16-bi

Find an expression for the total flux, Q. A rectangular loop is placed in t...

Q. A rectangular loop is placed in the field of an infinitely long straight conductor carrying a current of I amperes, as shown in Figure. Find an expression for the total

Averaged power dissipated in the load, (a) Consider the following transmiss...

(a) Consider the following transmission line with the reactance X1 placed across the input. It is being driven with a frequency ω such that the length of the line is λ/4. W

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd