Prepaid meters, Electrical Engineering

Assignment Help:

Prepaid Meters

Prepaid metering is a system whereby consumers purchase electricity by a smart card. The amount paid together along with other information is encoded in the smart card. In sequence to transfer the credit, the consumer inserts the card within the meter. The meter reads the data and whiles the paid for energy has been exhausted, the consumer gets the card reloaded/ reprogrammed. The system has the ability of programming along with time of use tariffs, multiple rates and etc.

The use of prepaid meters results in almost total elimination of non- payment and delayed payment and enables transfer of reliable, correct and up to date consumption and billing data according to tariff policy in use. This information can be utilized by the utility for demand forecasting and for controlling peak demands. It also means substantial reduction in staff for meter reading, bill complaints, bill serving, and bad debts, etc. Full meter programmability allows maximum flexibility in changing tariffs. Consumer can also decide in advance the affordable level of expenditure, which helps him and the utility in elimination of disputes regarding inaccurate bills.


Related Discussions:- Prepaid meters

Ramp type dvm, use of ranging and attenuator circuit

use of ranging and attenuator circuit

Find largest of n numbers stored in t memory, To determine the largest of n...

To determine the largest of n numbers stored into t memory, write a program in assembly language. A program of the largest of n numbers stored into t memory in assembly languag

Vital parameters of regulator quality, Vital parameters of regulator qualit...

Vital parameters of regulator quality: 1. The output voltage's temperature coefficient of is the change in output voltage with temperature (perhaps averaged over a certain tem

Explain about address structure, Q. Explain about Address Structure? A...

Q. Explain about Address Structure? Address Structure: ISDN address structure is illustrated in figure. ISDN number part has a maximum of 15 digits and ISDN sub address part

V-i characteristics - power semiconductor devices, V- I Characteristics ...

V- I Characteristics When the peak  value of  applied  voltage is less than the break over   voltage  of triac  and no signal  is applied to the triac  it will block  both  pos

Determine the equivalent impedance, Q. A 75-kVA, 230/115-V, 60-Hz transform...

Q. A 75-kVA, 230/115-V, 60-Hz transformer was tested with these results: • Open-circuit test: 115 V, 16.3 A, 750 W • Short-circuit test: 9.5 V, 326 A, 1200 W Determine:

Gis technology, GIS technology: GIS could be used to derive diverse in...

GIS technology: GIS could be used to derive diverse information for efficient technical and commercial management of a power distribution utility, e.g., capacity analysis, inv

CMA instruction of 8051., if contents of accumulator are all one''s then re...

if contents of accumulator are all one''s then result would be zero so Z flag should be affected and same if all zero''s.....but here it is written that no flags is affected...

Matlab simulation, Simulate and compare BER of QPSK system and 4-QAM system...

Simulate and compare BER of QPSK system and 4-QAM system without grey coding Eb/No=0.2.4.6.8.10

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd