Prepaid meters, Electrical Engineering

Assignment Help:

Prepaid Meters

Prepaid metering is a system whereby consumers purchase electricity by a smart card. The amount paid together along with other information is encoded in the smart card. In sequence to transfer the credit, the consumer inserts the card within the meter. The meter reads the data and whiles the paid for energy has been exhausted, the consumer gets the card reloaded/ reprogrammed. The system has the ability of programming along with time of use tariffs, multiple rates and etc.

The use of prepaid meters results in almost total elimination of non- payment and delayed payment and enables transfer of reliable, correct and up to date consumption and billing data according to tariff policy in use. This information can be utilized by the utility for demand forecasting and for controlling peak demands. It also means substantial reduction in staff for meter reading, bill complaints, bill serving, and bad debts, etc. Full meter programmability allows maximum flexibility in changing tariffs. Consumer can also decide in advance the affordable level of expenditure, which helps him and the utility in elimination of disputes regarding inaccurate bills.


Related Discussions:- Prepaid meters

Sectoral overview and enabling framework, Sectoral Overview and Enabling Fr...

Sectoral Overview and Enabling Framework Previously, you have studied about several Acts and Policies relevant to the power sector, their aims, main features and implications

Aci add immediate with carry instruction, ACI  Add Immediate with Carry  ...

ACI  Add Immediate with Carry  Instruction Similar  to ADC instruction 8 bit  data specified  in the  instruction and Carry  are added to the contents  of the  accumulator and

Subtract registers and borrow from accumulator, Subtract Registers and Borr...

Subtract Registers and Borrow from Accumulator The  contents of the  register  and borrow  flag  are subtracted from   the contents of the accumulator and the  result is  store

Can you draw robot configuration, a) Draw robot configuration. b) Explai...

a) Draw robot configuration. b) Explain the significance of end effectors. c) Define the terms (i) accuracy (ii) Repeatability (iii) Work volume (iv) Control Reso

Applications of operational amplifiers, Q. Applications of operational ampl...

Q. Applications of operational amplifiers? An op amp along with a few external components (resistors and capacitors) is capable of performing many different operations-hence th

Node-voltage method to find the current, Q. Use the node-voltage method to ...

Q. Use the node-voltage method to find the current I through the 5- resistor of the circuit of Figure.

Delay time - power semiconductor devices , Delay time ( t d ) Initiall...

Delay time ( t d ) Initially a thyristor  remains  in forward  blocking  stat when  anode to cathode forward  voltage  is applied  and gate  to cathode circuit is opened. As t

Power and power distribution, design a single phase circuit from a supply p...

design a single phase circuit from a supply point to a load

Classify the different types of insulating materials, Classify the differen...

Classify the different types of insulating materials with reference to their limiting safe temperatures for use. On the basis of insulating materials and their limiting safe te

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd