Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
What is meant by microcontroller?
A device which having the microprocessor with integrated peripherals like memory, serial ports, parallel ports, timer/counter, interrupt controller, data acquisition interfaces such as ADC,DAC is known as microcontroller.
Technical Loss Reduction - Power Supply 1. Technical loss reduction could be achieved through several measures such as network reconfiguration, load balancing, network recondu
Find a minimum two level, multiple-output AND-OR gate circuit to realize these functions (eight gates minimum). F 1 (a,b,c,d) =Σm(10,11,12,15) +D (4,8,14) F 2 (a,b,c,d) =Σm(4
CMOS processes: The low-performance "lateral" bipolar transistors occasionally employed in CMOS processes are sometimes designed symmetrically, i.e., with no distinction betwe
State Kirchoff's Current Law Kirchoff's Current Law (KCL) describes at any junction in an electric circuit the total current flowing towards that junction is equivalent to th
Designated Consumers - Features of Energy Conservation The Act gives the list of designated consumers, which involves the energy intensive industries, Railways, Port Trust, Tr
Multitasking - Single Processor Many Users Many Tasks In multitasking or also called time sharing systems multi user more than one users are sharing one processor
Equivalent Circuit : The equivalent circuit of a UJT is shown in fig. The P - N junction represented in the emitter by a diode. Silicon bar being lightly doped has a high res
Nodes analysis Analysis using KCL to solve for voltages at every common node of the network and as determines the currents by and voltages across every elements of the network.
1. Introduction : Theory: Frequency is the number of occurrences of a repeating event per unit time. It can also be defined as the number of repetitions (cycles) of a w
Phantom or Fictitious Loading Method While the capacity of meters under test is extremely high, testing with actual load method would includes a considerable loss of power and
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd