Method of observation by satellite, Civil Engineering

Assignment Help:

Q. Method of observation by satellite?

The difference between a photographs and imageries needs to be understood first. A photograph covers a specific area within its view and a picture is taken covering the full area at a time. Everybody is familiar with this process. A satellite observes and records the data line by line, which is made up of many points. The point-by-point observations of the intensity of light are taken in digital form. shows the movement of satellite and the process of observation in schematic way. The process can be compared to a scanner where the source of light travels over the document, collects, and stores the data in digital form.

Therefore, a satellite takes certain time to capture the data covering the specific area of interest. The collected digital data can be converted and printed on photographic paper to form a "photograph" called in the technical term as "imagery". This process can be compared to a Xerox machine, where a document is "scanned" and the data is printed on a paper.

Aircrafts and satellites are the other most commonly used methods for data acquisition from the earth surface. Aerial photography, i.e. remote sensing of data using aircrafts, took up shape with the development of aircrafts and its suitable remote sensing cameras. Aerial photography has the advantage of flexibility of operations and higher resolution.

2433_Method of observation by satellite.png


Related Discussions:- Method of observation by satellite

Define abrasion of steel structures - inspection of bridge, Define Abrasion...

Define Abrasion of steel structures? Abrasion of steel structures can generally be recognised by a worn, smooth, polished appearance of the surface.  Abrasion is caused by cont

LOADS, what are the difference between UDL and UVL?

what are the difference between UDL and UVL?

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Define the crash rate for intersection, An intersection has a total enterin...

An intersection has a total entering traffic volume of 42,000 vehicles per day.  During the past three years, there have been a total of 35 reported intersection-related crashes.

Diving operation - preparation for underwater inspection, Define Diving Ope...

Define Diving Operation - Preparation for underwater inspection? Use of experienced divers trained and screened by a reputed commercial diving school is critical for successful

Building physics, Actually my course name is energy and sustainable buildin...

Actually my course name is energy and sustainable building design Do you know the building physics

Design the water supply system a high service tank, Q. There is a railway c...

Q. There is a railway colony of 500 house holds source of water is from a tube well 800 m away. The colony is 10 m higher then the ground at source. Tube well is 60 meters deep. De

State the coulomb wedge theory, A retaining wall is battered away from the ...

A retaining wall is battered away from the fill from bottom to top at an angle of 15° with the vertical. Height of the wall is 6 m. The fill slopes upwards at an angle 15° away fro

Determine the final volume of the compacted soil, 30,000-yd 3 of banked so...

30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite.  The soil has 28% swell and shrinkage of 18%.  The final volume of the compacted so

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd