Meter Field Testing - Sealing Points

The meter seal should be tamper proof. The consumer should be briefed about seals. The sealing of all metering systems should be completed at several points (as applicable) to prevent tampering. There should be at least one seal at all points described below (wherever applicable):

a) CT Secondary Boxes (further to locking arrangement)

b) PT Secondary Box (further to the locking arrangement)

c) Meter Cabinet

d) Meter Test Block

e) Meter Terminal Cover

f) Meter Cover

g) Panel doors where CT and PT secondary circuits are terminated or whereas possibility for shorting or breaking exists and fuses/links are given.

h) PT selector relay box where automatic change-over of potential supply to meter from one PT to another is given

i) CT Primary Links and Top Covers

j) MD Reset Push Button

k) Boxes/Cabinets containing terminals for remote transmission of metered data through communication channels, junction boxes in the system and boxes wherein interface devices are mounted.

l) Meter reading port.

Seals are essential to guard against the tampering of connections and internal elements of a meter. Tampering of seals will provide consumers access to the relevant part of a meter installation where s/he could manipulate the unit to record less energy leading to commercial loss. A seal is placed to detect unauthorized entry to the meter internals. The effectiveness of the seal depends on the category of seal (whether it is tamper proof or not, whether a duplicate could be acquired or not, etc.), and the procedures used in tracking the seals.


Related Discussions:- Meter field testing - sealing points

what does quality factor mean, The Quality factor is also explained, as Q....

The Quality factor is also explained, as Q. So it is a number, which shows the lossness of a circuit. Higher the Q, the lower are the losses. The quality factor is calculated o

Draw the schematic diagram of the arrangement, Q. A two-winding, single-pha...

Q. A two-winding, single-phase transformer rated 3 kVA, 220:110 V, 60 Hz is connected as an autotransformer to transform a line input voltage of 330 V to a line output voltage of 1

Briefly explain about wye-delta transformation, Q. Briefly explain about Wy...

Q. Briefly explain about Wye-delta transformation? Certain network configurations cannot be reduced or simplified by series-parallel combinations alone. In some such cases wye-

Dc link scherbius drive - motor control , DC Link Scherbius Drive This ...

DC Link Scherbius Drive This type of scheme is shown in figure. This circuit  allows both  sub synchronous  and super synchronous speed control. In case  of sub synchronous spe

The city and guild electrical systems design task A and B, The city and gui...

The city and guild electrical systems design task A and 2365-305 Do you have these two assignments to sell ?

Find the corresponding change ib in the base current, Q. Using the small-s...

Q. Using the small-signal equivalent circuit of a BJT with gm = 0.03 S, β = 75, and VA = 65 V, a load resistor RL is connected from the collector to the emitter, as shown in Figure

Laser beam machining and electron beam melting, Differentiate between LBM a...

Differentiate between LBM and EBM process on the basis of application and limitations.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd