Insurance required to be incorporated in deal, Civil Engineering

Assignment Help:

Question

Is procurement of third party insurance required to be incorporated in deal for construction works?


Answer


Purpose of third party insurance is to guard contractors from bankruptcy in case there are severe accidents happened to third party due to construction work. Then, in government contracts, contractors are requested contractually to secure third party insurance from origination of contract until end of preservation Period. If contractors have financial ability to handle the claims because of accidents to third party, client is not bound to include this necessity in contract.

 


Related Discussions:- Insurance required to be incorporated in deal

Explain about overhauling of level xing, Q. Explain about Overhauling of Le...

Q. Explain about Overhauling of Level xing? Each level crossing except those laid with PSC sleepers must be opened out and the condition of sleepers and fittings, rails and fas

Explain the term - prestressing force, Explain the term - Prestressing Forc...

Explain the term - Prestressing Force Due to the stretching of  tendons, tensile stresses develop inside tendons. Resultant prestressing force in tendons may be calculated by m

Explain horizontal circular curves - transportation, Explain Horizontal Cir...

Explain Horizontal Circular Curves - Transportation Horizontal circular curve is a circular arc between two straight lines known as tangents.

Surveying, define traverse.purpose of traverse, procedures of traverse, tak...

define traverse.purpose of traverse, procedures of traverse, taking linner measurment, types of traverse, convert the following quardnatal bearing to wcb. 1.OA= N15 deg10mins ''E,

Heating season duration , Change the model to take into account the variati...

Change the model to take into account the variation in outdoor temperature for a "typical" day in the heating season based on the heat loss by the fabric and the heating of incomin

What is the thickness of the concrete seal needed, Design a Cylindrical Ope...

Design a Cylindrical Open Caisson to be sunk by 30 m of sand to support a load of 50 MN. The allowable bearing pressure is 1700 kN/m 2 . Test the feasibility of sinking the caisson

How is skin friction and point resistance of a pile computed, Describe the ...

Describe the basic difference in the bearing capacity computation of shallow and deep foundations. How are skin frictions and point resistance of a pile computed?

Surveying, with a neat well labelled sketch, explain reciprocal ranging.

with a neat well labelled sketch, explain reciprocal ranging.

Pipes, difference between delievery and suction pipe?

difference between delievery and suction pipe?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd