Insurance required to be incorporated in deal, Civil Engineering

Assignment Help:

Question

Is procurement of third party insurance required to be incorporated in deal for construction works?


Answer


Purpose of third party insurance is to guard contractors from bankruptcy in case there are severe accidents happened to third party due to construction work. Then, in government contracts, contractors are requested contractually to secure third party insurance from origination of contract until end of preservation Period. If contractors have financial ability to handle the claims because of accidents to third party, client is not bound to include this necessity in contract.

 


Related Discussions:- Insurance required to be incorporated in deal

RAFTING, WHY RAFTING IS REQUIRED AND WHAT PRECAUTIONS SHOULD BE TAKEN DURIN...

WHY RAFTING IS REQUIRED AND WHAT PRECAUTIONS SHOULD BE TAKEN DURING RAFTING? AND WHAT IS THE ALTERNATE OF RAFTING.?

Pattern of load distribution of piles in such agreement, Question For a...

Question For a rigid pile cap with vertical piles at middle and raking piles at the sides, what is pattern of load distribution of piles in such agreement? Answer Becau

List the significant engineering classification system, How do you distingu...

How do you distinguish among clay and silt in the field? State the purpose of identification and categorization of soils. List any three significant engineering classification syst

Hydraulics and Hydrology , A flow rate of 200 gpm of oil with u=1.5 x 10-3 ...

A flow rate of 200 gpm of oil with u=1.5 x 10-3 lb-sec/ft2 and p=1.7 slug/ft3 occurs in a 4-in pipe. Determine the Reynolds number. Classify the flow as laminar or turbulent. What

KNIFE EDGE LOADING, How does the knife edge load simulate the existing cond...

How does the knife edge load simulate the existing condition of the bridge structure?

What do you mean by manhole loss, Q. What do you mean by Manhole loss? ...

Q. What do you mean by Manhole loss? Manholes are provided in locations where there are changes in direction, size and gradient of gravity pipelines. Generally practice for str

Contours, how can you draw contours of a non square grid?

how can you draw contours of a non square grid?

Purpose of dowel bars in elastomeric bearing, Q. Purpose of dowel bars in e...

Q. Purpose of dowel bars in elastomeric bearing? Elastomeric bearing is generallycategorized into two types: free andfixed. For fixed types bridge deck is permitted only to rot

Simply calculation, If i want to find D, and D=2a, then a=1-5 how can i s...

If i want to find D, and D=2a, then a=1-5 how can i show the ans is:2&4&6&8&10

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd