Determine the problems formed while design of pre-stressed concrete Two types of problems are encountered by the engineer engaged in the design of pre-stressed concrete membe
how prepared for surveying?
Q. Diffrence between Rowe cell and Oedometer apparatus? The benefits of using Rowe cell over oedometer apparatus are: (i) It possesses control facilities for drainage and
how to draw a shear force diagram
max. moment at cantilever in up or down of support or free of end
Q. Define Hammer efficiency and coefficient of restitution? Hammer efficiency refers to ratio of kinetic energy of hammer to the rated energy (or potential energy). Basically i
Determine the latitude and departure of each side of the closed traverse ABCDA. Total the latitudes and departures. TIP: For Closed Traverse, Sum of Latitudes is Z
4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench
Question Would a sub-base layer be served as a drainage layer to take away water from pavement? Answer As well providing load distribution in post-construction stage a
how is total station used?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd