How to observe water level, Mechanical Engineering

Assignment Help:

Q. How to observe water level?

Site for installing gauges should be properly selected. The reach should be reasonably straight and of uniform cross· section and slope. The length of such a reach should not be less than 400 m and need not be more than 1600 m. When the length is restricted upstream of the measuring section, it should be double of that on the downstream side. When near a confluence, the site, if on a distributory, should be beyond backwater effect and if on the mainstream, should be beyond the disturbance due to tributary or structures like weirs. The site should be easily accessible even during floods.


Related Discussions:- How to observe water level

Determine the diameter of wire - close coiled helical spring, Determine the...

Determine the diameter of wire - close coiled helical spring: A close coiled helical spring has to absorb 100 N-m of energy while compressed to 10 cm. The coil diameter is 10

Sketch stress-strain diagram for mild steel, Sketch stress-strain diagram f...

Sketch stress-strain diagram for Mild Steel in tension and also describe the important points. Also draw stress-strain curve for cast Iron, concrete and for elastic rubber only.

Calculate the actual mechanical output, Question: A 4- pole DC motor is...

Question: A 4- pole DC motor is operated as a separately excited motor.  When the motor is externally driven at 1800 rpm with rated field current and zero armature current,

Find out the deflection - vertical, Find out the deflection: Find out ...

Find out the deflection: Find out the deflection (vertical) at a distance 'a' from the tip in Example Solution As in this case there is no load at the point where the

LPP, (Hint Minimization problem -min X1 + X2, s.t. 2X1 + X2 = 12, X1 + 6X2 ...

(Hint Minimization problem -min X1 + X2, s.t. 2X1 + X2 = 12, X1 + 6X2 = 24, 5X1 + 8X2 = 24; X1, X2 = 0).

What is the make group of euler operators, The Make Group of Euler Operator...

The Make Group of Euler Operators The Make group consists of four operators for adding some elements into the existing model creating a new one, and a Make-Kill operator for ad

Describe mould surface coating, Describe Mould Surface Coating? Mould...

Describe Mould Surface Coating? Mould surfaces are coated (after the pattern is drawn out) with certain materials possessing high refractoriness. It eliminates the poss

Calculate the thickness of insulation, A hot gas at 300°C flows through a l...

A hot gas at 300°C flows through a long metal pipe 100mm outer diameter and 3mm thick. From the standpoint of safety and energy conservation, mineral wool insulation of thermal con

What is squeeze time, Q. What is Squeeze time? It is the time between t...

Q. What is Squeeze time? It is the time between the initial application of the electrode pressure on the work and the initial application of current to make the weld. During th

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd