How to observe water level, Mechanical Engineering

Assignment Help:

Q. How to observe water level?

Site for installing gauges should be properly selected. The reach should be reasonably straight and of uniform cross· section and slope. The length of such a reach should not be less than 400 m and need not be more than 1600 m. When the length is restricted upstream of the measuring section, it should be double of that on the downstream side. When near a confluence, the site, if on a distributory, should be beyond backwater effect and if on the mainstream, should be beyond the disturbance due to tributary or structures like weirs. The site should be easily accessible even during floods.


Related Discussions:- How to observe water level

Design ventilation systems for plant, Q. Design Ventilation Systems for pla...

Q. Design Ventilation Systems for plant? While some natural ventilation may sometimes be used, a pressurized HVAC (heating, ventilation and air-conditioning) system is more typ

Manufacturing methods of ceramics, Manufacturing Methods Of Ceramics Th...

Manufacturing Methods Of Ceramics The ceramics manufacturing consists in shaping along with or without pressure and firing to consolidate. The simplest and cheapest process of

Mechanical properties of materials, A tensile test on a specimen having an ...

A tensile test on a specimen having an initial diameter of 13.11 mm and an initial gauge length of 200.0 mm, gave the following data:

Compressive stress, Compressive Stress: The stress induced in a body, ...

Compressive Stress: The stress induced in a body, when subjected to two equal and opposite pushes as shown in figure (a) as a result of which there is an decrease in length

Woodwork, with the aid of notes and sketches describe how you would transfe...

with the aid of notes and sketches describe how you would transfer the design from a sheet of paper onto the wooden panel prior to carving

Factored axial load, You have been selected to assist the structural engine...

You have been selected to assist the structural engineer for a bridge replacement project.  Your task is to design the size of the footing for an interior bridge pier, based on the

Project to generates a parent population of size, This project involves a t...

This project involves a test of the basic idea behind the bootstrap method. Essentially you will write a program that: 1. Generates a parent population of size 100,000 whose dis

Temporary stone scuppers - culverts, Temporary Stone Scuppers: In hil...

Temporary Stone Scuppers: In hill roads, it is customary to cut the roads from the hill-face and to open up the road immediately thereafter to traffic. Further improvements s

Stress, Difference between direct and shear stress

Difference between direct and shear stress

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd