Q. How to observe water level?

Site for installing gauges should be properly selected. The reach should be reasonably straight and of uniform cross· section and slope. The length of such a reach should not be less than 400 m and need not be more than 1600 m. When the length is restricted upstream of the measuring section, it should be double of that on the downstream side. When near a confluence, the site, if on a distributory, should be beyond backwater effect and if on the mainstream, should be beyond the disturbance due to tributary or structures like weirs. The site should be easily accessible even during floods.


Related Discussions:- How to observe water level

Boiler, What is scale formation in case of a boiler

What is scale formation in case of a boiler

Thermodaynamic, Ask question #MiThe steam that leaves the super-heater is e...

Ask question #MiThe steam that leaves the super-heater is expanded from 130bar at 535°C to 25.2bar at 310°C in a high pressure turbine. The steam from the exit of the HP turbine is

Home home, why 4R kinematic chain do not form different mechanisms?

why 4R kinematic chain do not form different mechanisms?

Balancing, what do you mean by static and dynamic unbalance in machinery

what do you mean by static and dynamic unbalance in machinery

Draw bending moment diagram, Draw bending moment diagram: Draw the she...

Draw bending moment diagram: Draw the shear force diagram (SFD) & bending moment diagram (BMD) for the beam illustrated in Figure . Solution Reaction at the support A,

Illustrate reversible-irreversible and quasi-static process, (a) Illustrate...

(a) Illustrate reversible, irreversible and Quasi-static process with examples. (b) What do you mean by terms change of state, path, process, property, cycle. (c) Distinguish

Ottto cycle, For a theoretical OTTO cycle operating on compression ratio of...

For a theoretical OTTO cycle operating on compression ratio of 8.5:1taking in air at 15C and 101.3kPa and having a maximum cycle temp of 1800C.Calculate the temp after compression,

Module assembly site preparation, Q. Module Assembly Site Preparation? ...

Q. Module Assembly Site Preparation? To set a module on the piles installed on project site, the following preparations shall be made: The Designer shall provide design elev

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd