Q. How to design Shape of guide bunds?

Alignment of guide bunds converging on the upstream was considered by Bell, Spring and Gales to allow for the waterway obstructed by piers on bridge line.

With such a shape, flow may separate after passing round upstream curved heads leading to shoal formation on flanks near the bridge axis rendering end bays inactive. Divergent guide bunds were conceived by Haigh and Spring to mitigate tendency of separation. The distance between the worst loop of the river and the approach bank however gets reduced and shoal formation in the centre in the wide section some time occurs. Symmetrical and parallel guide bunds were proposed by Spring and Sethi as depicted. When provided with upstream curved heads of sufficiently big radius, this shape of guide bunds is found to prevent separation of flow along flanks and help in effecting equitable distribution of discharge across the bridge section.


Related Discussions:- How to design shape of guide bunds

What is over vibration of fresh concrete, Q. What is Over vibration of fres...

Q. What is Over vibration of fresh concrete? For proper compaction of concrete by immersion vibrators, vibrating part of the vibrators must be completely inserted into the conc

Defected Timber, Please tel me about Timber Defected

Please tel me about Timber Defected

Construction of the building, a) Certain data for the materials used in the...

a) Certain data for the materials used in the construction of the building, e,g, insulation, building materials, air spaces, etc.  b)  Draw, with appropriate dimensions, the cro

Soil plug in marine piling system of steel tubular pile, Soil plug in marin...

Soil plug in marine piling system of steel tubular pile with reinforced concrete infill At the time of initial driving process, open-ended steel piles are driven through the s

Explain the statements about the critical path method, 1. Determine a netwo...

1. Determine a network diagram method that uses only finish-to-start relationships and may use dummy activities to define logical relationships.  2.  Precedence diagr

Method of observation by satellite, Q. Method of observation by satellite? ...

Q. Method of observation by satellite? The difference between a photographs and imageries needs to be understood first. A photograph covers a specific area within its view and

Significance of tailwater level in culverts, Significance of tailwater leve...

Significance of tailwater level in culverts Headwater level and tailwater level of culverts are significant parameters in hydraulic design. Headwater level can't be set too la

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd