Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A 70-ft long, ¾" diameter, 6 x 7 FC wire rope is resisting a tension force of 12-kips. The elastic stretch of the steel wire rope given the following properties is most nearly: E = 10,000-ksi; A = 0.288-in2
Solution: The elongation or "stretch" of wire ropes must be considered in designing temporary bracing and lifting configurations. Elongation comes from two sources: (1) constructional stretch is dependent on the classification and results primarily from a reduction in diameter as load is applied and the strands compact against each other. Constructional stretch is provided by the manufacturer and is always given. (2) Elastic stretch is caused by deformation of the metal itself when load is applied. Use the following equation to establish a value for elastic stretch:
Elastic Stretch = PL / AE
Where: P= change in load; L=length; A=area of wire rope; E=modulus of elasticity.
Elastic Stretch = 12-kips x 70-ft x 12-in/ft/ (0.288-in2 *10,000-ksi) = 3.5-in
= 3.5-in
the propane gas tank has an inner diameter of 1500mm and wall thickness of 15mm. If the wall is pressurized to 2MPa, determine the absolute maximum shear stress in the wall of tank
Explain the Components of a rebound Hammer? Several components of a rebound hammer are displayed in below Figure. 1. Concrete surface; 2. Impact spring; 3. Rider on gui
Pavement of evaluation
Temporary bench marks
Requirements of Good Building Stones Here described requirements of good building stones: Strength: The stone should be capable to resist the load coming on
how to draw a regular hexagon using semicircle method
Dimensions of trusses
Two pumping wells 1,000 m away fully penetrate the same confined aquifer. One of the wells pumps at a rate of 1,240 m3/day. The second well pumps at 850 m3/day. If the aquifer has
metallic tape
Project specifications require a relative compaction of 95% (modified Proctor). Construction of a highway embankment requires 10,000-yd 3 of fill. The borrow soil has an in-situ
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd