When approach banks are of medium height upto 3 m, the material may be homogeneous. For bigger heights zoned section with impervious core and pervious outer sections may be desirable.

Foundation should provide a stable support for overlaid bank and should resist harmful percolation. Unconsolidated material in foundation is liable to settlement and percolation of water. Cut off trenches backfilled with rolled impervious material, sheet pile cut off, grouting, clay blanket on upstream side and inverted filter on downstream side are helpful in minimising harmful effect of percolation.


Related Discussions:- How to design banks

Determine the final volume of the compacted soil, 30,000-yd 3 of banked so...

30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite.  The soil has 28% swell and shrinkage of 18%.  The final volume of the compacted so

Mr Kamal Saxena, What is WBM road. How it is constructed?

What is WBM road. How it is constructed?

Define the usage of data from hydrographs, Define the usage of Data from Hy...

Define the usage of Data from Hydrographs Flow rates and volume quantities over time. Predictions based on the runoff flow rates. The characteristics of the drainage b

What do you know about shallow piers, Q. What do you know about Shallow Pie...

Q. What do you know about Shallow Piers? In case of some of the existing bridges, piers may be shallow and grip may be found to be inadequate. Protection round piers is then re

Point of virtual fixity of lateral loading for piles, Point of virtual fixi...

Point of virtual fixity and critical length of lateral loading for piles Some engineers can get confused about the difference between the two terms which are point of virtual

Major compensation of using hdpe as compared with cast iron, Question N...

Question Now, mainly flap valves are ended of HDPE. What is the major compensation of using HDPE as compared with cast iron? Answer (i) It has no response with sewage

Steps to determine hydraulic horsepower for pump problems, Steps to determi...

Steps to determine the hydraulic horsepower (whp) for pump problems:  1) Determine (h A ) by rearranging the Bernoulli equation.    2) Apply (h A ) into the equation found i

Explain the terms void ratio, (a) Distinguish among Black cotton soil and L...

(a) Distinguish among Black cotton soil and Laterite from an engineering point of view. (b) Explain the terms 'Void ratio', 'Degree of saturation' and 'Water content', define th

Diver qualification - diving operation for bridge inspection, Define Diver ...

Define Diver Qualification - Diving Operation for Bridge Inspection? The requisite qualification for divers and diving supervisors are given in IS 10291 -1982, which stipulates

Guidelines for selection of site, Guidelines for Selection of Site: Th...

Guidelines for Selection of Site: The following are some of the guidelines for selecting the site of a bridge : (a) A site which is on a straight reach of the river is pref

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd