Q. How to design banks?

When approach banks are of medium height upto 3 m, the material may be homogeneous. For bigger heights zoned section with impervious core and pervious outer sections may be desirable.

Foundation should provide a stable support for overlaid bank and should resist harmful percolation. Unconsolidated material in foundation is liable to settlement and percolation of water. Cut off trenches backfilled with rolled impervious material, sheet pile cut off, grouting, clay blanket on upstream side and inverted filter on downstream side are helpful in minimising harmful effect of percolation.


Related Discussions:- How to design banks

Define reactivity - hazardous waste, Define Reactivity - Hazardous Waste ...

Define Reactivity - Hazardous Waste - Undergoes violent Change w/o detonating - reacts violently with water - Forms potentially explosive mixtures with water - generat

Traffic surveys, Traffic Surveys: The following traffic surveys are n...

Traffic Surveys: The following traffic surveys are needed for preparing a good road project: Classified Volume Counts This survey is normally carried out for 7 days,

State the term - total loss of prestress, Total loss of prestress The ...

Total loss of prestress The total amount of losses of prestresses may be accounted for in a prestressed concrete member by adding different losses which may take place for tha

Heat transfer, Three mechanisms: 1) Conduction - occurs in solids and st...

Three mechanisms: 1) Conduction - occurs in solids and stationary fluids (liquids or gases). 2) Convection - occurs in fluids. Change in the buoyancy of the fluid due to its

Calculate uniform annual cost for maintenance and repair, A contractor purc...

A contractor purchased a Caterpillar D-13 dozer for $100,000 and owned it for five years. The annual cost for maintenance and repair is provided in the Table. With annual interest

Designing of pipe jacking, Question While designing of pipe jacking , ...

Question While designing of pipe jacking , what particular areas on pipe joints have to engineers make sure of? Answer While in pipe jacking, jacked pipes may well ha

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd