Conditions of pumping performance, Civil Engineering

Assignment Help:

Question

In conditions of pumping performance, how have to engineers determined use of radial flow pumps and axial flow pumps?


Answer

Exact speed is usually defined for a pump operating at its utmost efficiency. In command to minimize price of future operation, it is attractive to operate pumps as close to maximum efficiency point as possible. Specific speed for radial flow pumps is comparatively small at what time compared with that of axial flow pumps. This implies that radial flow pumps be inclined to give higher head with lower discharge as axial flow pumps tend to give higher discharge with lower head.

 


Related Discussions:- Conditions of pumping performance

Estimate total dissolved solids, Estimate total dissolved solids, Alkalinit...

Estimate total dissolved solids, Alkalinity and Hardness A sample of water from Brazos River at Brenham was collected and analyzed for water quality characteristics and the dat

Centroid, how tofind centroid of cercular arc

how tofind centroid of cercular arc

Cost-volume relationship, Cost-volume relationship: Cost-volume relati...

Cost-volume relationship: Cost-volume relationship is illustrated through a simple example dealing with the cost of operating an automobile. To perform the analysis following

Define underwater magnetic particle testing, Define Underwater Magnetic Par...

Define Underwater Magnetic Particle Testing? Underwater magnetic particle testing (UWMT) is a non-destructive testing suited for detection of surface cracks or discontinuities

Effect of rusting on steel reinforcement, Effect of rusting on steel reinfo...

Effect of rusting on steel reinforcement Corrosion of steel reinforcement inside a concrete structure is undesirable in the subsequent ways:  (i)  Presence of rust impairs

What is the absolute maximum shear stress, A strip load of considerable len...

A strip load of considerable length and 1.5 m width transmits a pressure of 150 kN/m 2 to the underlying soil. Verify the maximum principal stress at 0.75 m depth below the footin

Sewer, what are the procedure of surveying for sewer projects/

what are the procedure of surveying for sewer projects/

Rcc, what is the density of rcc

what is the density of rcc

RefConc Triangle Section''s bending stress, When I use allowable stress des...

When I use allowable stress design, how can I get depth of N.A and resultant force of Compression at triangle section? It''s Reinforced Concrete...

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd