Hiley formula in designing of h-piles, Civil Engineering

Assignment Help:

Question

Is it resourceful that engineers rely solely on Hiley's formula in designing of H-piles?


Answer

About 90 percent of H-piles accept Hiley's formula for design. Though, this method is only applicable to pile lengths less than 30 meter and is appropriate for course-grained resources. In Hiley's method, by observing penetration of piles after hammer impact, pile aptitude could be willingly obtained from answer of the impacting force. Then, individual pile ability be able to be obtained by this active system.

 


Related Discussions:- Hiley formula in designing of h-piles

Culverts, Can anyone help me in finding the formula for submerged and unsub...

Can anyone help me in finding the formula for submerged and unsubmerged flow in culverts?

Determine about the prestressed concrete, Determine about the prestressed c...

Determine about the prestressed concrete In prestressed concrete the most important parameter is the prestressing force. Ifthe prestressing force reduces with time, prestresses

Shear stress, shear stress numerical of T section & I section to find maxim...

shear stress numerical of T section & I section to find maximum shear stress

Pavement Drainage, What would be the best way to evaluate the field perform...

What would be the best way to evaluate the field performance benefits of subsurface drainage in a flexible pavement? Short term and long term, thick or thin HMA..

Construction management, pert disadvantages of software support, datacolle...

pert disadvantages of software support, datacollection , interpretation of results issues

What do you mean by shallow gradient of pipes, Q. Colebrook White formula s...

Q. Colebrook White formula suitable for shallow gradient of pipes? Manning's Equation is commonly used for rough turbulent flow while Colebrook-White Equation is adopted for t

Explain pressure balance method and compressed air method, Pressure balance...

Pressure balance method vs. compressed air method in pipe jacking Pressure balance method generally requires the use of mechanically operated tunnel-boring machine at its cutti

Geo Technical Project, I have a geo technical Project that I need to be sol...

I have a geo technical Project that I need to be solved correctly and accurately within 15 hours exact, please. Steps and details must be included. Thanks a lot and let me know ASA

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd