For a community of 100,000, determine the size and number of aeration basins in a municipal activated sludge treatment facility. The wastewater characteristics are:

 Average per-capita flow rate = 100gal/capita-day

 Hydraulic residence time = 6 hrs

 Wastewater concentration

 BOD5 = 220mg/L

      SS = 220 mg/L

Ans: Average flow rate = (100 gal/capita-day)(100.000pop)(106gal/Mgal)=10 Mgal/day  

The size of the aeration basin may be determined based on a typical value for hydraulic residence time of 6 hr (4-8 hrs is the range) for a conventional activated sludge process.

992_Determine the Size and Number of Aeration Basins.png


Related Discussions:- Determine the size and number of aeration basins

Cumulative distribution function - poisson distribution, Cumulative distrib...

Cumulative distribution function - Poisson distribution: Find the cdf of Y = X 1 , + X 2 where X I and X 2 independently follow Poisson distribution with parameters λ l an

Levellng, introduction of levelling

introduction of levelling

Explain precedence relationships - construction management, Explain the Pre...

Explain the Precedence Relationships a. Finish-to-Start - the most common, the predecessor activity must finish before the successor activity can start b. Finish to Finish

Rebound hammer.., rebound hammer working mechanism with detailed specificat...

rebound hammer working mechanism with detailed specifications of the images

In marine pile type of steel tubular piles, Question In marine pile typ...

Question In marine pile type of steel tubular piles with reinforced concrete infill, least toe level is frequently specified in contract drawings. What is the purpose in your v

Workshop drawings, Workshop Drawings  (Contractor Scope) 1. Air Co...

Workshop Drawings  (Contractor Scope) 1. Air Conditioning and Ventilation Systems: Builder work drawings Enlarged scale double line HVAC System Duct & piping layouts

Good surface regularity for sub-base in concrete pavement, Q. Good surface ...

Q. Good surface regularity for sub-base in concrete pavement? Surfaces of sub-base material for concrete carriageway must be built in a regular manner due to the following reas

Lateral load, http://www.expertsmind.com/questions/tributary-lateral-load-3...

http://www.expertsmind.com/questions/tributary-lateral-load-30133097.aspx

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd