Determine the size and number of aeration basins, Civil Engineering

Assignment Help:

Determine the Size and Number of Aeration Basins?

For a community of 100,000, determine the size and number of aeration basins in a municipal activated sludge treatment facility. The wastewater characteristics are:

 Average per-capita flow rate = 100gal/capita-day

 Hydraulic residence time = 6 hrs

 Wastewater concentration

 BOD5 = 220mg/L

      SS = 220 mg/L

Ans: Average flow rate = (100 gal/capita-day)(100.000pop)(106gal/Mgal)=10 Mgal/day  

The size of the aeration basin may be determined based on a typical value for hydraulic residence time of 6 hr (4-8 hrs is the range) for a conventional activated sludge process.

992_Determine the Size and Number of Aeration Basins.png


Related Discussions:- Determine the size and number of aeration basins

Engineering Graphics, Draw a parabola , height 40mm and bass 120mm using of...

Draw a parabola , height 40mm and bass 120mm using offset method

Laplace transform, Using Laplace transfom, the following differential equat...

Using Laplace transfom, the following differential equation d y dy dt reduces to the algebraic equation of the form Resolve y(s) into partial fractions

Major dissimilarity between standpipe, Question What is major dissimila...

Question What is major dissimilarity between standpipe, standpipe piezometer and piezometer ? Answer Standpipe usually contains plastic pipes with punctured holes at

Cutting edge in well foundation, Q. Cutting edge in well foundation? Th...

Q. Cutting edge in well foundation? The function of cutting edge on well foundation is basically to cut through the earth which being sunk. The angle of well curb pushes the ea

Geo Technical Project, I have a geo technical Project that I need to be sol...

I have a geo technical Project that I need to be solved correctly and accurately within 15 hours exact, please. Steps and details must be included. Thanks a lot and let me know ASA

Various operations involved in maintenance by beater packing, Q. Explain in...

Q. Explain in details the various operations involved in Through Packing - conventional Maintenance by beater packing. Explain the various operations as per the Permanent Way

Determine the ruthann graphical method, A retaining wall with a vertical ba...

A retaining wall with a vertical back 5 m high supports cohesion less backfill of unit weight of 19 kN/m 3 . The upper surface of the backfill rises at an angle of 10° with the hor

Main purpose of conducting load test for piling works, Question What is...

Question What is main purpose of conducting load test for piling works ? Answer Pile load test gives information on ultimate bearing ability but not settlement be

Calculation of deformation, Calculation of deformation For calculation ...

Calculation of deformation For calculation of deformation at some stage before the total creep is reached,  it may be assumed that about half the total creep takes place  in  f

Stabilization of Black Cotton soil, How the stabilization of black cotton ...

How the stabilization of black cotton soil was done in field? what are the methods to do that?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd