Is it true that rational process has to not be used for large catchments in estimating peak runoff?
Answer
Rational process is appropriate for small catchments only as time of absorption of small catchments is small. In Rational system peak runoff is calculated based on assumption that time of concentration is equal to rainfall duration. For small catchments, this assumption might hold true in mainly circumstances. One of assumptions of rational process is that rainfall intensity over entire catchment remains constant all through storm period. Though, in case of a large catchment it stands a high possibility that rainfall intensity varies in a variety of part of large catchment. In adding, for long period of rainfall, it is rare that rainfall intensity remains constant over total rainstorm and a shorter period but an additional intense rainfall might create a higher peak runoff. Furthermore, a decrease of peak runoff is also brought about by temporary storage of storm water similar to channels within catchment.
In genuine condition, runoff rate within catchment differs from place to place since of different soil properties and past conditions. Sometimes peak free occurs before all of drainage area is contributing. For example, when a significant portion of drainage area within catchment has very little time of concentration so that a higher rainfall strength be able to be used for this portion, runoff coming solely from this portion is higher than that of whole catchment in which a lower rainfall strength is adopted since remaining part of catchment has comparatively large occasion of concentration. Therefore, this results in wrong estimation of peak runoff of large catchments if rational process is adopted.
What is the calculation method of load bearing capacity of formwork material?
Q. Utilisation of Buoyancy Effect? Submerged part of the substructure will be subjected to buoyancy effect. The uplift pressure from the ground water can be utilised by constru
Perimeter of a hexagonal pyramid
measurement of gauge box for sand ?
if the WBM Road is constructed with 80mm , 40mm metal what will be the depreciation factor per year, how much thickness of the layer will be reduced per year due to trafic and rai
Explain Handheld Inspection tools for Underwater Inspection of Bridge? Handheld tools such as flash lights, rulers, and tape measures for documenting areas; small or large hamm
Surface Drainage: Surface drainage deals with arrangement for quickly leading the water from rainfall away from the surface of pavements, shoulders, slopes of embankments and
Purpose of plane table
Ceramics is what type of materials ? Answer: It is an insulators.
What is 'contact pressure'? How does it depend on the type of structure and type of soil? What is 'active zone' in soil? Define it with reference to the pressure bulb concept.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd