Question
Is it true that rational process has to not be used for large catchments in estimating peak runoff?
Answer
Rational process is appropriate for small catchments only as time of absorption of small catchments is small. In Rational system peak runoff is calculated based on assumption that time of concentration is equal to rainfall duration. For small catchments, this assumption might hold true in mainly circumstances. One of assumptions of rational process is that rainfall intensity over entire catchment remains constant all through storm period. Though, in case of a large catchment it stands a high possibility that rainfall intensity varies in a variety of part of large catchment. In adding, for long period of rainfall, it is rare that rainfall intensity remains constant over total rainstorm and a shorter period but an additional intense rainfall might create a higher peak runoff. Furthermore, a decrease of peak runoff is also brought about by temporary storage of storm water similar to channels within catchment.
In genuine condition, runoff rate within catchment differs from place to place since of different soil properties and past conditions. Sometimes peak free occurs before all of drainage area is contributing. For example, when a significant portion of drainage area within catchment has very little time of concentration so that a higher rainfall strength be able to be used for this portion, runoff coming solely from this portion is higher than that of whole catchment in which a lower rainfall strength is adopted since remaining part of catchment has comparatively large occasion of concentration. Therefore, this results in wrong estimation of peak runoff of large catchments if rational process is adopted.
A footing foundation for a water tower carries a load of 9000 kN and is 3.6 metres square. It rests on dense sand of 9 m thickness overlying a clay layer of 3 metres depth. The cla
Q. Do you mean by Accelerated Aging? Accelerated ageing tests are conducted at elevated temperature of 100 o C to know the variation in hardness, UTS and elongation at break.
Q. Direction of placing the main weight of reinforcement in concrete pavement? The reinforcement of concrete pavement is typically in the form of longmesh type. A road generall
Define the term - prestressing force It should be realized that the maximum amount of prestressing force which can be transferred from tendons to concrete depends on the bond
derivation for strain energy stored in a body due to torsion
Unsealed contraction joints in concrete pavement For unreinforced concrete pavement, contraction joint is an approximately 3mm wide groove with a depth of about one-third to o
cons and pros of fracking
Types of fluid mechanics
A No 10 steel rebar is tested in tension by monitoring the load reading of the testing machine it was found that the specimen yielded at aload of 41600lb and fractured at 48300 lb
explain the construction while aligning roads on hilly areas
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd