For prestressed concrete members, the high-tensile steel, used generally, consists of wires, bars or strands. The high tensile strength of steel is generally achieved by marginally increasing the carbon content in steel in comparison to mild steel. High-tensile steel usually contains 0.6 to 0.85% carbon, 0.7 to 1 % manganese, 0.05% of sulphur and phosphorus. The high carbon steel ingots are hot rolled into rods and cold drawn through a process of dies to reduce the diameter and increase the tensile strength. The durability of wires gets improved due to the cold-drawing operation. The cold-drawn wires are then tempered to improve their properties. Tempering or ageing or stress relieving by heat treatment of wires at 150-420°C improves the tensile strength. These cold-drawn wires are generally available in nominal sizes of 2.5, 3,4,5,7 and 8 mm diameter. #question..
the cooke''s reversible level
can we provide base isolation for high rise buildings ? Can we provide it for diagrid structures? if; yes Up to which no of storeys
Q. Write short notes on Numerical rating of Bridges? In the numerical rating system, the condition of a bridge is represented by a number consisting eight digits. This eight di
What does the term offset mean in relation to modulus of elasticity?
Explain the Toxic Characteristics - Hazardous Waste - From the results of either - Extraction Procedure(EP) toxicity (prior to March 1990) or Toxicity Characteristic Leachi
Q. What is Shock transmission unit in bridges? Shock transmission unit is fundamentally a device connecting separate structural units. It's characterized by its ability to tran
Explain the Routine inspections - inspection of bridge? These determine the physical and functional condition of the structure, identifying changes from the inventory, baseline
i am facing some problem in solving the problem of elongation due to self weight suspended from fixed support in the conical bar
A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of
Limitations of trabsmibilty of forces
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd