Feed speed-spindle rpm-cutting time material removal rate, Mechanical Engineering

Assignment Help:

A hole of 25 mm diameter and 62.5 mm depth is to be drilled. The suggested feed is 1.25 mm/rev.and the cutting speed is 60 m/min. Assume the clearance height is 5 mm. Determine: feed speed, spindle rpm, cutting time and Material removal rate.


Related Discussions:- Feed speed-spindle rpm-cutting time material removal rate

Find kinematic viscosity, A pump is used to deliver discharge of 0.05 ...

A pump is used to deliver discharge of 0.05 m 3 /s from a river to a storage reservoir. The system consists of 500 m of 0.15 m cast iron pipe with a 90 o bend with a rad

What is conformance testing, What is Conformance Testing Conformance Te...

What is Conformance Testing Conformance Testing : There was no mechanism for testing processors or resolving errors between two processors.

What is the make group of euler operators, The Make Group of Euler Operator...

The Make Group of Euler Operators The Make group consists of four operators for adding some elements into the existing model creating a new one, and a Make-Kill operator for ad

Show the types of changes in project, Q. Show the types of Changes in proje...

Q. Show the types of Changes in project? During the development and execution of a project, the following changes can occur:  Scope of work changes  Cost deviation

Estimate the horizontal at equilibrium angel, (Rigid body acceleration) A ...

(Rigid body acceleration) A tank of water accelerates down an icy frictionless ramp of angle . What angle ( ) does the water make with the horizontal at equilibrium?

Evaluate reaction of support of the frame, Evaluate reaction of support of ...

Evaluate reaction of support of the frame: How can you evaluate reaction of support of the frame? Sol.: The frames are usually supported on roller support or on a hinge

Determine frequency of free oscillations, (a) Illustrate critical damping a...

(a) Illustrate critical damping and its uses. (b) A horizontal spring mass system with coulomb damping has a mass of 5 Kg attached to a spring of stiffness 1KN/m. if the coeffic

Foundry shiz, is there any assignment answers

is there any assignment answers

Air-gas cross-limiting and air-gas ratio control, Q. Air-Gas Cross-Limiting...

Q. Air-Gas Cross-Limiting and Air-Gas Ratio Control? The Steam Generator firing demand signal is directed to two discrete signal selectors. A low signal selector ensures that

Illustrate torsionally equivalent shaft, (a) Illustrate Torsionally Equival...

(a) Illustrate Torsionally Equivalent shaft. (b) Determine the natural frequencies and mode shapes for the system shown in figure I 1 = 10 Kg -m 2 I 2 = 40 Kg -m 2

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd