False set in pile driving, Civil Engineering

Assignment Help:

Q. False set in pile driving?

For pile driving in certain soils such as dense silt and weathered rock, occurrence of false set phenomenon isn't uncommon. During the driving process, negative pore water pressure is developed and driven piles appear to have sufficient capacity during pile driving as the built-up of negative pore water pressure results in an apparent temporary increase in driving strength andresistance. Though sometime after the pile driving, dissipation of this negative pore water pressure will decrease the bearing strength in resisting the design loads. Occasionally the presence of cracks along pile sections can bring about the problem of false set by dampening effect of stress wavesby these cracks. To evade the problem of false set, a specific percentage of constructed piles must be chosen to perform re-driving to check for false set phenomenon.


Related Discussions:- False set in pile driving

Temporary repairs to rail fracture, Q. Temporary Repairs to rail fracture? ...

Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/

Beam to column connection, what are the characteristics of the beam to colu...

what are the characteristics of the beam to column connection?

Design of flexible pavements - road pavements, Design of Flexible Pavements...

Design of Flexible Pavements: The design of flexible pavements is done by the CBR method. The CBR test, described further, gives an indication of the supporting power of the

Process in terms of shrinkage of concrete, In bridge widening projects, mea...

In bridge widening projects, means of stitching is normally employed for connecting existing deck to a new deck. What are the problems that occur connected with this process in ter

Why we need transition slabs in bridges, Q. Why we need Transition slabs in...

Q. Why we need Transition slabs in bridges? In a number of designs, transition slabs are provided on the approach to bridges. For example soils in embankment supporting the ro

How to calculate the vertical stress, A rectangular foundation, 2 m × 4 m, ...

A rectangular foundation, 2 m × 4 m, transmits a uniform pressure of 450 kN/m 2 to the underlying soil. Verify the vertical stress at a depth of 1 metre below the foundation at a

Determine the final volume of the compacted soil, 30,000-yd 3 of banked so...

30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite.  The soil has 28% swell and shrinkage of 18%.  The final volume of the compacted so

Show ph value of water, Q. PH Value of Water? It is a symbol for hydrog...

Q. PH Value of Water? It is a symbol for hydrogen ion concentration and indicates acidity or alkalinity. When P H Value more than 7 water is alkaline and less than 7 water is a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd