During deep excavation, neighbouring ground water table is drawn down that might affect settlement of nearby buildings. What is remedial proposal to rectify situation?


Answer

One of methods to manage settlement of nearby buildings Because of excavation work is by recharging. Water composed in wells in deep excavation is place back to top of excavation in order to raise drawn-down water table. Location of recharge has to be properly selected to ensure soil is adequately permeable to transfer pumped water back near pretentious building.

 

 


Related Discussions:- Remedial proposal to rectify situation

Explain about vierendeel girder, Q. Explain about Vierendeel girder? Vi...

Q. Explain about Vierendeel girder? Vierendeel girder design is sometimes adopted in design of footbridges. Traditionally truss design, triangular shape of truss is generally u

Explain the clearance interval - signalized intersections, Explain the Clea...

Explain the Clearance Interval - Signalized Intersections  Also known as "Red Clearance Interval" and "All Red"        r = (w+L) / V - If there is no pedestrian traffic r

Slope, how to calculate a slope

how to calculate a slope

Define the finish to finish activity, A finish-to-finish activity is best d...

A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti

One-way pre stressing vs two-way pre stressing, Q. One-way pre stressing vs...

Q. One-way pre stressing vs two-way pre stressing? At the time of pre-stressing operation at one end, frictional losses will take place and the prestressing force decreases alo

Aluminium sliding window detail drawings, what are the details of aluminium...

what are the details of aluminium sections and how are they connected for making a door or window

Total station, describe in detail the various parts of a total station

describe in detail the various parts of a total station

Higway engineering, Ask question Design the pavement by group index method ...

Ask question Design the pavement by group index method for heavy traffic using following subgrade data Soil passing 75micron sieve =65%,liquid limit =40%plastic limit =20% #Min

What is the main reason being for the phenomenon, Sometimes side of concret...

Sometimes side of concrete bridges is observed to turn black in colour . What is the main reason being for the phenomenon ?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd