During deep excavation, neighbouring ground water table is drawn down that might affect settlement of nearby buildings. What is remedial proposal to rectify situation?


Answer

One of methods to manage settlement of nearby buildings Because of excavation work is by recharging. Water composed in wells in deep excavation is place back to top of excavation in order to raise drawn-down water table. Location of recharge has to be properly selected to ensure soil is adequately permeable to transfer pumped water back near pretentious building.

 

 


Related Discussions:- Remedial proposal to rectify situation

Calculate the total board feet, A project engineer has ordered 100 hardwood...

A project engineer has ordered 100 hardwood boards, 1-1/4-in thick by 8-in wide and 8-ft long.  The total board feet ordered is most nearly:  Solution: 1.25" x 8" x 8' x 100

Design of prestressed concrete pipes, Design of prestressed concrete pipes ...

Design of prestressed concrete pipes The design of prestressed concrete pipes should cover the following five stages : (a) Circumferential prestressing, winding with or wit

Acsr aluminium conductor steel reinforced are utilized as , Q. ACSR (Alumi...

Q. ACSR (Aluminium Conductor Steel Reinforced) are utilized as (A) over head transmission lines.            (B) super conductors. (C) fuse

Skid resistance of wearing course, Skid resistance of wearing course S...

Skid resistance of wearing course Skid resistance of wearing course in a bituminous pavement is contributed by macro texture (which implies the general surface roughness) and

Aggregate value, how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE

how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE

Surveying, closed traverse ABCDE form a regular polygon with fore bearing o...

closed traverse ABCDE form a regular polygon with fore bearing of line is 35 find the bearing of other lines

Rectilinear motion, A train starts from rest as A and accelerates at 1,7m/...

A train starts from rest as A and accelerates at 1,7m/s2 to full speed at which it maintains until the brakes gives it a deceleration of 1,7m/s2 to stop at B. AB=1,6km. determine

Roofs, describe the general principle of roof design

describe the general principle of roof design

#high way engineering about road pavements.., what is the function of longi...

what is the function of longitudinal joints in concrete road pavements?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd