Explain the steady and uniform flow, Civil Engineering

Assignment Help:

Explain the Steady and Uniform Flow

Steady flow: Flow quantity does not change over time.

Uniform flow: The slopes of the energy grade line S = dE/dL, the hydraulic grade line S = dd/dL, and the channel bottom So = dz/dL, are all equal. S0 = geometric slope.


Related Discussions:- Explain the steady and uniform flow

Quantity calculation for subgrade preparation, reparation of subgrade in sq...

reparation of subgrade in sqm for a road of span 12 km and width 5.25m,with shoulders of 0.75m span on both the sides...considering extrawidening too......plz help...i m preparing

Principle for conducting surface regularity test, Question What is dist...

Question What is distinction in principle for conducting surface regularity test and sand test? Answer Purpose of surface regularity test is to assess riding quality

Plastic, what is plastic?its types and composition and its uses as engineer...

what is plastic?its types and composition and its uses as engineering material

Surveying., with a neat well labelled, explain reciprocal ranging in survey...

with a neat well labelled, explain reciprocal ranging in surveying.

Estimation specification and costing, Estimate the single room of size 3m x...

Estimate the single room of size 3m x 4m x height 3m using individual wall method?

Measurement of cement and aggregates, Measurement of cement and aggregates ...

Measurement of cement and aggregates - by weight vs. by volume Measurement of constituents for concrete is usually carried out by weight since of the following reasons: (i)

Water absorption test for precast concrete pipes, Question What is the ...

Question What is the major purpose of carrying out water absorption test for precast concrete pipes? Answer Cement will mix with additional water than is compulsory t

Chemical deterioration - underwater inspection of bridge, Define Chemical D...

Define Chemical Deterioration - Underwater inspection of Bridge? Chemical deterioration may occur in concrete, which has not been properly compacted, or through environmental p

Construction measurment, calculating quantity of excavation, formwork, conc...

calculating quantity of excavation, formwork, concrete

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd