Explain plate jig, Civil Engineering

Assignment Help:

Explain Plate jig

1) The major parts of this jig is plate from which it takes its name other necessary parts and drill bush and locating pins.

2) Plate jigs are general for drilling holes in long strips or at angles.

1053_Explain Plate jig.png

3) Various strips are stacked and plate jig is possible above them locating it by pins on mutually perpendicular sides.


Related Discussions:- Explain plate jig

Uses of bricks, Uses of Bricks In the following civil works Bricks are ...

Uses of Bricks In the following civil works Bricks are used: a. in building blocks. b. For lining of ovens, chimneys and furnaces. c. As aggregates in providing water

One-way pre stressing vs two-way pre stressing, Q. One-way pre stressing vs...

Q. One-way pre stressing vs two-way pre stressing? At the time of pre-stressing operation at one end, frictional losses will take place and the prestressing force decreases alo

Wmm, why use wmm upon gsb can be laid dbm directly upon gsb

why use wmm upon gsb can be laid dbm directly upon gsb

State the term- friction in tendon, State the term- friction in tendon ...

State the term- friction in tendon Considerable frictional loss takes place due to friction between the tendon and the material surrounding it, namely the concrete or the sheat

Distortion energy theory, Distortion energy theory: Let us now conside...

Distortion energy theory: Let us now consider the solid shown in Figure. (a)        By inspection we may see that the solid is safe according to principal stress theor

Determine the crash rate - transportation, A five-mile long section of two-...

A five-mile long section of two-lane road has an AADT of 8,000.  There have been six crashes on this section of road during the past two years.  What is the crash rate? R sec

Explain the createthread function used in the windows nt, Explain the Creat...

Explain the CreateThread Function used in the Windows NT CreateThread(security, size, MyThreadFunction, arg, flag,&tID ) The CreateThread function call is used to start an i

Calculate the final volume of the compacted soil, 1. 130,000-yd 3 of banke...

1. 130,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%.  The final volume of the compacted

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd