Explain plate jig, Civil Engineering

Assignment Help:

Explain Plate jig

1) The major parts of this jig is plate from which it takes its name other necessary parts and drill bush and locating pins.

2) Plate jigs are general for drilling holes in long strips or at angles.

1053_Explain Plate jig.png

3) Various strips are stacked and plate jig is possible above them locating it by pins on mutually perpendicular sides.


Related Discussions:- Explain plate jig

Premix carpet open graded, what is premix carpet open graded and where is i...

what is premix carpet open graded and where is it used and what are its limitations ?

Rocks, Define rocks,types of rock,rock formations

Define rocks,types of rock,rock formations

Distomat, definition,old&new modern&difference

definition,old&new modern&difference

Building technology 1, what are the defects in timber due to natural forces...

what are the defects in timber due to natural forces?

Neglecting bearing at the tip of the piles, A square pile group of 9 piles ...

A square pile group of 9 piles of 25 cm diameter is arranged with a pile spacing of 1m. The length of the piles is 9 m. Unit cohesion of the clay is 75 kN/m 2 . Neglecting beari

Joint filler in concrete expansion joints - a must, Joint filler in concret...

Joint filler in concrete expansion joints - a must?? Presence of joint filler is required to the proper functioning of concrete joints however some may doubt its value. For a c

Determine the flow velocity, Determine the flow velocity in 2,000 ft of 8 i...

Determine the flow velocity in 2,000 ft of 8 inch diameter piping flowing full. The energy lost in piping is 54 ft. Use nominal pipe diameter and C = 140.     Solution: Use v =

Degree, what classes do you have to take and what are some school options?

what classes do you have to take and what are some school options?

Measure the safe load on the pile, A wood pile of 10 m length is driven by ...

A wood pile of 10 m length is driven by a 1500 kg drop hammer falling by 3 m to a final set equal to 1.25 cm per blow. Measure the safe load on the pile using the Engineering Ne

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd