Explain mild and high-yield steel, Civil Engineering

Assignment Help:

High-yield steel vs. mild steel as road reinforcement

High yield steel is the preferred material for the reinforcement of concrete carriageway due to the subsequent reasons:

(i)  The primary function of steel reinforcement in concrete pavement is to control cracking. If mild steel is adopted for reinforcement, upon initiation of crack formation mild steel becomes overstressed and is prone to yielding. High yield steel provides resistance to crack growth. The above situation is generally encountered where there is abnormal traffic loads on concrete carriageway exceeding the design limit. 

(ii) High-yield steel is less prone to deformation and bending at the time of routine handling operation.

(iii)In the current market, steel mesh reinforcement is generally of high-yield steel type and usage of mild steel as road reinforcement needs the placing of special orders to the suppliers.


Related Discussions:- Explain mild and high-yield steel

Major drawbacks of using inverted siphons, Question What is key application...

Question What is key application of inverted siphons? What are major drawbacks of using inverted siphons ? Answer Inverted siphons are planned at locations in which sewer s

Gas welding be erected in upright position, Question Explain some reaso...

Question Explain some reasons why should acetylene gas cylinders used for gas welding be erected in upright position? Answer Acetylene gas is usually used for gas wel

Semi dense bituminous concrete, Semi Dense Bituminous Concrete: Semi ...

Semi Dense Bituminous Concrete: Semi Dense Bituminous Concrete (SDBC) is similar to BC, but with a higher void content (5-10 per cent, as against 3-5 per cent in the case of

Determine the ultimate bearing capacity of a square footing, Determine the ...

Determine the ultimate bearing capacity of a square footing, 1 m × 1 m, resting on saturated clay of unconfined compression strength of 180 kN/m 3 and a bulk density of 18 kN/m 3

Methods of contouring by grid points, the elevations of grid points for an ...

the elevations of grid points for an area as follows: 1 2 3 4 5 6 7 8 F 690 709 726 732 735 740 743 747 E 696 715 729 736 740 737 739 740 D 702 723 733 742 737 737 745 747 C 707 72

Indicate quality of rock foundation, Question During piling works, norm...

Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by

Investigation scour for underwater inspection of bridge, Define Investigati...

Define Investigation Scour for Underwater Inspection of Bridge? Investigation Scour is probably the most critical item to be aware of when performing an underwater inspection o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd