Explain mild and high-yield steel, Civil Engineering

Assignment Help:

High-yield steel vs. mild steel as road reinforcement

High yield steel is the preferred material for the reinforcement of concrete carriageway due to the subsequent reasons:

(i)  The primary function of steel reinforcement in concrete pavement is to control cracking. If mild steel is adopted for reinforcement, upon initiation of crack formation mild steel becomes overstressed and is prone to yielding. High yield steel provides resistance to crack growth. The above situation is generally encountered where there is abnormal traffic loads on concrete carriageway exceeding the design limit. 

(ii) High-yield steel is less prone to deformation and bending at the time of routine handling operation.

(iii)In the current market, steel mesh reinforcement is generally of high-yield steel type and usage of mild steel as road reinforcement needs the placing of special orders to the suppliers.


Related Discussions:- Explain mild and high-yield steel

Cleanliness of surface - limitations of ultrasonic system, Define Cleanline...

Define Cleanliness of Surface - Limitations of Ultrasonic System? Sound energy transmission is greatly affected by marine growth on the surface of the concrete element. Ultraso

Foundations, Design a footing of a bridge pier

Design a footing of a bridge pier

Steel, A No 10 steel rebar is tested in tension by monitoring the load read...

A No 10 steel rebar is tested in tension by monitoring the load reading of the testing machine it was found that the specimen yielded at aload of 41600lb and fractured at 48300 lb

Shear force, Shear distribution for I section

Shear distribution for I section

Construction Planning, A contractor has both a 3-cy and a 5-cy shovel in th...

A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working day

Distomat., write a note on distomat

write a note on distomat

Method of construction of a bored cast-in-situ concrete pile, Q. Method of ...

Q. Method of construction of a bored cast-in-situ concrete pile? Ans. - Bored cast-in-situ concrete pile - A guide casing of 3 to 4 m length is provided on top of the bore hole

What should be the hydrometer reading, A litre of suspension containing 0.5...

A litre of suspension containing 0.5 N of soil with a specific gravity of 2.70 is prepared for a hydrometer test. When no temperature correction is considered necessary, what shoul

Which are the colloidal impurities in water, Q. Which are the Colloidal Imp...

Q. Which are the Colloidal Impurities in water? The finely divided particles of soil such that their small quantities are not Visible to the naked eye are

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd