Explain mild and high-yield steel, Civil Engineering

Assignment Help:

High-yield steel vs. mild steel as road reinforcement

High yield steel is the preferred material for the reinforcement of concrete carriageway due to the subsequent reasons:

(i)  The primary function of steel reinforcement in concrete pavement is to control cracking. If mild steel is adopted for reinforcement, upon initiation of crack formation mild steel becomes overstressed and is prone to yielding. High yield steel provides resistance to crack growth. The above situation is generally encountered where there is abnormal traffic loads on concrete carriageway exceeding the design limit. 

(ii) High-yield steel is less prone to deformation and bending at the time of routine handling operation.

(iii)In the current market, steel mesh reinforcement is generally of high-yield steel type and usage of mild steel as road reinforcement needs the placing of special orders to the suppliers.


Related Discussions:- Explain mild and high-yield steel

Foundation, difference between raft and pile foundation question..

difference between raft and pile foundation question..

engineering drawings, Triangular prism axis is parallel to both HP and V

Triangular prism axis is parallel to both HP and VP

Routing maintenance and major maintenance, What is the difference between r...

What is the difference between routing maintenance and major maintenance in school facilities? Ans) The routine maintenance is the minor and consistent repairs that are engaged

Determine the in-situ dry unit weight, Q. The following observations were r...

Q. The following observations were recorded in a Field density determination by sand-replacement method: Volume of Calibrating can = 1000 cm3 Weight of empty can = 10 N We

Define the void ratio and specific gravity of particles, Derive the formula...

Derive the formula among soil moisture content (w), degree of saturation (S), specific gravity (G), and void ratio (e). Saturated clay has a water content of 40% and bulk specif

Why does pipe jacking machine usually get stuck, Q. Why does pipe jacking m...

Q. Why does pipe jacking machine usually get stuck when the ground condition change from soil to very hard rock? When pipejacking machine moves from anarea of soil to very hard

Water treatment, The transmission main from the well field to the community...

The transmission main from the well field to the community is 2500 ft, the velocity of flow at peak pumping capacity is 3.5 fps, water temperature is 10oC, and pH is 7.5. If free c

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd