Explain mild and high-yield steel, Civil Engineering

Assignment Help:

High-yield steel vs. mild steel as road reinforcement

High yield steel is the preferred material for the reinforcement of concrete carriageway due to the subsequent reasons:

(i)  The primary function of steel reinforcement in concrete pavement is to control cracking. If mild steel is adopted for reinforcement, upon initiation of crack formation mild steel becomes overstressed and is prone to yielding. High yield steel provides resistance to crack growth. The above situation is generally encountered where there is abnormal traffic loads on concrete carriageway exceeding the design limit. 

(ii) High-yield steel is less prone to deformation and bending at the time of routine handling operation.

(iii)In the current market, steel mesh reinforcement is generally of high-yield steel type and usage of mild steel as road reinforcement needs the placing of special orders to the suppliers.


Related Discussions:- Explain mild and high-yield steel

Define hand tools for underwater inspection of bridge, Define Hand Tools fo...

Define Hand Tools for Underwater Inspection of Bridge? Hand tools involve scrapers, wire brushes, chain and wire ropes. Tools of this kind are suited in which cleaning is confi

Coagulation, incoming water contains 15 mg/L as a substance

incoming water contains 15 mg/L as a substance

PLANKING AND STRUTING FOR SHALLOW EXCAVATION, DEFINITION TYPE STEP OF CON...

DEFINITION TYPE STEP OF CONSTRUCTION STEP OF SAFETY

Road binders - bitumen, Road Binders: Bitumen: Bitumen is a viscous, s...

Road Binders: Bitumen: Bitumen is a viscous, semi-solid material, dark in color, having adhesive properties, and derived from the distillation of petroleum crude in a refinery

Interface between base plates and footings, Interface between base plates a...

Interface between base plates and footings Surface of footings is generally quite rough so that some levelling has to be carried out for base plates. Interface between base pl

Determine the allowable bearing pressure of the sand, Two load tests were c...

Two load tests were conducted at a site-one with a 0.5 m square test plate and the other with a 1.0 m square test plate. For a settlement of 25 mm, the loads were found to be 60 kN

Concrete, Determine the quantity of materials required per batch and probab...

Determine the quantity of materials required per batch and probable output from a concrete mixing plant of 1200lts capacity. The design per 1000lts of mixed concrete is as follows

Assignment, do u do drawing assignment ( 3rd angle projection)

do u do drawing assignment ( 3rd angle projection)

What is specific energy - hydrologic system, What is Specific Energy Ap...

What is Specific Energy Applying the Bernoulli energy equation in open channel flow results in Z = 0 (channel bottom or datum), the pressure head (p/γ) = d, and the velocity he

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd