Determine about the hard-drawn steel wires, Civil Engineering

Assignment Help:

Determine about the Hard-drawn steel wires

Hard-drawn steel wires which are indented or crimped are preferred for pre-tensioned members as their bond characteristics are superior to the plain wires. Strands normally comprise two, three or seven wires of 2 to 5 mm size. The helical form of  twisted wires in the strand improves the bond strength. Two and three-ply strands are made up of 2 mm and 3 mm diameter wires while a seven-ply strand is made by  twisting 2 to 5 mm wires.

 


Related Discussions:- Determine about the hard-drawn steel wires

Material engineering assignment, select three materials metal and non meala...

select three materials metal and non mealat at least one of the selected materials shold change its property

Theories of failure - cases of solids, Theories of Failure - cases of solid...

Theories of Failure - cases of solids: Let us now consider the solid shown in Figure (b). (a)        As the principal stresses are within 260 MPa, the solid is safe ac

Paint, different types of paints?

different types of paints?

Design of steel lug angles with channel sections.., while designing the lug...

while designing the lug angles with the channel section what does "the force not acccounted for by the direct connection of member" mean?

Engineering Mechanics, the jet transport B is flying north with a velocity ...

the jet transport B is flying north with a velocity vB = 600 km/h when a smaller aircraft A passes underneath the transport headed in the 60 degree direction shown. To passengers i

DC POWER SUPPLY, DESIGN A LINEAR DC POWER SUPPLY WITH THE FOLLOWING SPECIFI...

DESIGN A LINEAR DC POWER SUPPLY WITH THE FOLLOWING SPECIFICATION,SHOW DETAILS STEPS AND CALCULATION...Vload :12v Iload :0.07A Vripple load(p-p) :0.01v TA :45 DEGREE CELCUS

Building classification, Why I is the missing after h and J is written in t...

Why I is the missing after h and J is written in the classification of building

Principle of airlifting for cleaning pile bores, Q. Principle of airlifting...

Q. Principle of airlifting for cleaning pile bores? Airlifting is generally carried out before concreting to remove debris and clean the base of pile bores. It basically acts a

What is imp rest stores, Q. What is Imp rest Stores? Material obtained ...

Q. What is Imp rest Stores? Material obtained not for specific works but as a standing advance for the purpose of material urgent requirements as and when they arise should wit

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd