Explain about overhauling of level xing, Civil Engineering

Assignment Help:

Q. Explain about Overhauling of Level xing?

Each level crossing except those laid with PSC sleepers must be opened out and the condition of sleepers and fittings, rails and fastenings inspected at least once a year or more frequently, as warranted by conditions. However, level crossings laid with PSC sleepers should be overhauled with each cycle of machine packing or more frequently as warranted by conditions and in no case shall opening be delayed by more than two years. In all cases, rails and fastenings in contact with the road shall be thoroughly cleaned with wire brush and a coat of coal tar/anti-corrosive paint applied. Flange way clearances, cross level, gauge and alignment should be checked and corrected as necessary, and the track packed thoroughly before reopening the level crossing for road traffic.


Related Discussions:- Explain about overhauling of level xing

Indirect tensile strength in water-retaining structures, Q. Indirect tensil...

Q. Indirect tensile strength in water-retaining structures ? Crack width formation is dependent on the early tensile strength of concrete. Principle of critical steel ratio als

Determine the station and elevation of turning point, A -3.00% grade inters...

A -3.00% grade intersects a +1.25% grade at Sta. 85+80 and elevation 210.00 ft.  A 350-ft vertical curve connects the two grades.  Determine the station and elevation of turning po

Dressing of stones.., what is dressing of stones and its various types

what is dressing of stones and its various types

Impact test - tests on stones, Impact Test: Resistance of stones to ...

Impact Test: Resistance of stones to impact is found by conducting tests in impacting testing machine .It contain of a frame with guides in which a metal hammer weighing 13.

Water technology, Explain with lime soda process?cold lime soda process&hot...

Explain with lime soda process?cold lime soda process&hot lime soda process and it''s equations?

Principle of airlifting for cleaning pile bores, Q. Principle of airlifting...

Q. Principle of airlifting for cleaning pile bores? Airlifting is generally carried out before concreting to remove debris and clean the base of pile bores. It basically acts a

Explain procedure of remote sensing in satellites, Q. Explain procedure of ...

Q. Explain procedure of remote sensing in Satellites? Satellites used for remote sensing are of two types, viz, geostationary and polar orbiting. Geostationary stationary satel

Concepts and definitions of thermodynamics, System A system (often cal...

System A system (often called a closed system) is any collectionof matter within a prescribed boundary, but no matter may enter or leave the system.  Note 1. That the bo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd