A feedback control system with the configuration of Figure has the following parameters: Kp = 0.5 V/rad, Ka = 100 V/V, Km = 2.7 × 10-4 N·m/V, J = 1.5 × 10-5 kg·m2 , and F = 2 × 10-4 kg·m2 /s.
(a) With an applied step-input command, describe the dynamic response of the system, assuming the system to be initially at rest.
(b) Find the position lag error in radians, if the load disturbance of 1.5×10-3 N·m is present on the system when the step command is applied.
(c) In order that the position lag error of part (b) be no greater than 0.025 rad, determine the new amplifier gain.
(d) Evaluate the damping ratio for the gain of part (c) and the corresponding percent maximum overshoot.
(e) With the gain of part (c), in order to have the percent maximum overshoot not to exceed 25%, find the value of the output-rate gain factor.
explain the working of schottky ttl nand gate?
Q. Show Applications for Synchronous Motors? With constant-speed operation, power factor control, and high operating efficiency, three-phase synchronous motors are employed in
CLC or π Filter The above diagram displays CLC or π type filter, which mainly contains a capacitor filter, followed through LC section. This filter offers a quite smooth o
Singles Phase Half wave Controlled Rectifier with RL Load When gate pulses are applied to the thyristor at output voltage v0 follows the input voltage v s ( = V m sin ) s
Use of Monitoring and control in nuclear and chemical plants In nuclear and chemical plants, there is generally a combination of control and monitoring taking place. Informatio
Q. A three-phase load, connected to a 440-V bus, draws 120 kWat a power factor of 0.85 lagging. In parallel with this load is a three-phase capacitor bank that is rated 50 kVAR . D
A 150 km long, 3-phase, 400 kV overhead line is used to transmit 1800 MW to a distribution area at 0.9 power factor lagging. The line parameters per phase and per unit length in st
Q. With the help of circuit diagram explain a Miller Sweep generator Figure given below shows the circuit of a Miller integrator or a sweep circuit. Transistor Q1 acts as a swi
What is faithful amplification. What are basic condition for faithful amplification. Describe : (a) Peak Inverse voltage. (b) Maximum forward current. (c) Knee voltage
what is defective capacitor?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd