Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A feedback control system with the configuration of Figure has the following parameters: Kp = 0.5 V/rad, Ka = 100 V/V, Km = 2.7 × 10-4 N·m/V, J = 1.5 × 10-5 kg·m2 , and F = 2 × 10-4 kg·m2 /s.
(a) With an applied step-input command, describe the dynamic response of the system, assuming the system to be initially at rest.
(b) Find the position lag error in radians, if the load disturbance of 1.5×10-3 N·m is present on the system when the step command is applied.
(c) In order that the position lag error of part (b) be no greater than 0.025 rad, determine the new amplifier gain.
(d) Evaluate the damping ratio for the gain of part (c) and the corresponding percent maximum overshoot.
(e) With the gain of part (c), in order to have the percent maximum overshoot not to exceed 25%, find the value of the output-rate gain factor.
find the net value of power if an average value of energy is assumed to be $0.05/KWh, the capacity value is $30/kw-yr ...
Stator Current Control Methods The torque and speed of an induction motor can be controlled by the stator current the motor behaviour is different from that with VS
WHAT IS THE FUNCTION OF DELAY LINE IN CRO
block diagram .
Find the resistance of 1 km of copper cable having a diameter of 10 mm if the resistivity of copper is 0.017 x 10 -6 Ωm.
Q. Explain working of Presentation Layer? This is concerned with format of the data represented, in order to overcome difference in representation of information as supplied to
Earthing : Any electrical appliance with a metal casing or with metal parts, likely to be touched by an operator is potentially dangerous. The danger is that an internal or extern
kindly send us the formula and C program for performance improvement of distribution system using HV/LV ratio. REGARDS ANUJ AGARWALA
compensation techniques
Question 1: a) Describe how pipelining can improves the efficiency of the fetch-execute cycle. b) Explain the term superscalar architecture. c) Explain the term prin
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd