Estimate prestress losses, Civil Engineering

Assignment Help:

Given:

beam deminsions:
flange width=22"
FLANGE THICKNESS=7"
WEB WIDTH=7"
SECTION HEIGHT=40"

f'c=5000psi
f'ci=3500psi
fpu=270ksi
Ap=eighteen 1/2" diam strands
superimposed load=.85k/ft: 40' simple span
Type I cement; moist cured
Pretensioned beam

Required:

1. Estimate prestress losses at midspan 90 days after release. (elastic shortening,creep,shrinkage,steel relaxation)


Related Discussions:- Estimate prestress losses

Compass surveying, Compass Surveying: You have studied about the compa...

Compass Surveying: You have studied about the compass and its use for bearings of measuring survey lines. The angular measurements are carried out with prismatic compass that

Determine the size of the standpipe which should be used, A sample in a var...

A sample in a variable head permeameter is 8 cm in diameter and 10 cm high. The permeability of the sample is estimated to be 10 × 10 -4 cm/s. If it is desired that the head in th

Define the cost of shock transmission unit, Define the Cost of shock transm...

Define the Cost of shock transmission unit? There is a keen competition among the few STU manufacturers. For the second Bassein Creek Bridge, the average cost of two STUs of ca

Hill roads, functions of breast wall& scupper

functions of breast wall& scupper

Geometric design of roads, Geometric Design Of Roads: Geometric design...

Geometric Design Of Roads: Geometric design of roads deals with elements such as cross-section, horizontal and vertical alignment, sight distances, lateral and vertical cleara

What is codal provisions, According to National Building Code (Sp:7 1970), ...

According to National Building Code (Sp:7 1970), the differential settlement shall be kept within the limits to which the superstructure can accommodate itself without harmful dist

Tack rivet, tack rivet figures with connections

tack rivet figures with connections

Calculate the horizontal distance, Calculate the Horizontal Distance A ...

Calculate the Horizontal Distance A surveyor's total station measured slope distance near station 3245+26.35 is recorded as 437.380-m with a zenith angle of 118º 48' 07" and a

State the procedure of prestressing, State the procedure of prestressing ...

State the procedure of prestressing When these wires cool down, concrete is poured in the moulds in which these tendons are provided in a stretched condition. Using this proces

Construction management, pert disadvantages of software support, datacolle...

pert disadvantages of software support, datacollection , interpretation of results issues

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd