Perform a personal skills audit, Civil Engineering

Assignment Help:

Perform a Personal Skills Audit

Your employer wishes you to become an effective and confident self-directed employee. With this in mind they have set you some tasks. These will enable you to assess and develop a range of professional and personal skills in order to promote your personal and career development

Tasks

Task 1
Relate approaches to self-managed learning that you have already implemented. Consider other approaches.
Evaluate approaches to self-managed learning.

Task 2
Consider the advantages and disadvantages of methods identified, both from a personal perspective and from that of an organisation.
Evaluate the benefits of self-managed learning to the individual and the organisation.

Task 3
How could you be encouraged further with personal and professional lifelong learning? What would motivate you in this regard?
Propose ways in which lifelong learning in personal and professional contexts could be encouraged.

Task 4
Perform a personal skills audit. You must consider current skills and competencies against professional standards and employer objectives.
Evaluate own current skills and competencies against professional standards and organisational objectives.

Task 5

Produce a personal development plan. You need to identify your current and future development needs and processes and activities required to implement the plan. Identify specific opportunities to meet your needs.

Discuss the processes and activities required to implement the development plan.

Devise a personal and professional development plan based on identified needs.

Identify development opportunities to meet current and future defined needs.

Identify own development needs and the activities required to meet them.

Indicative characteristics:

1-Effective thinking has taken place around personal & professional development issues

2-Conclusions have been reached following research and synthesis of ideas.

3-A range of sources of information has been used.

4-Explanations have been drawn from experience/research and conclusions are justified.

5-Coherent, logical development of management concepts and associated topics.

6-Various methods of presentation have been used and technical language has been accurately used

7-Accurate precedence and line of balance plans have been generated by learner.

8-Appropriate and accurate referencing using the Harvard referencing system

9-Thorough evaluation of personal & professional development issues has taken place.

10-There is evidence of clear reflection on current skills and competencies

11-Autonomy and independence has been demonstrated.

12-Answers have been arrived at through additional personal research.

13-Effective thinking has taken place around personal & professional development issues

14-Innovative and creative personal & professional development ideas have been generated.


Related Discussions:- Perform a personal skills audit

Levelling, Permanent adjustment and temporary adjustment

Permanent adjustment and temporary adjustment

Functions of water stops in joints of box culverts, Question What will func...

Question What will functions of water stops in joints of box culverts and drainage channels ? Answer Principal function of water stops is to stop liquids, water-borne materials

Show the filter below the revetment, Q. Show the filter below the revetment...

Q. Show the filter below the revetment? A filter placed between the revetment / protection works at the surface and the soil bed below the revetment / protection works. Main fu

Determine the liquidity index and void ratio of the sample, A piece of clay...

A piece of clay taken from a sampling tube has a wet weight of 1.553 N and volume of 95.3 cm . After drying in an oven for 24 hours at 105°C, its weight is 1.087 N. The liquid and

Retaining walls, Retaining Walls: A wall used to retain some material ...

Retaining Walls: A wall used to retain some material on one or both sides of it can be termed as retaining wall. Commonly, it is used to retain soil at two different levels on

Traditional marine piling system of steel tubular pile, Question What i...

Question What is problem in traditional marine piling system of steel tubular pile with concrete infill and what are key possible remedial measures? Answer In design

What is the meaning of compressive stresses, What is the meaning of compres...

What is the meaning of compressive stresses These intentionally induced stresses are compressive in nature and these compressive stresses reduce or completely remove the undesi

Bridge loadings, Bridge Loadings: Loadings of bridges have been standa...

Bridge Loadings: Loadings of bridges have been standardized by the Roads Congress. The major features of the various load classes are given below : Bridges and culvert

State the term - post-tensioned concrete, State the term - Post-tensioned c...

State the term - Post-tensioned concrete In Post-tensioned concrete construction, as shown in Figure,  tendons are placed inside concrete and stretched after concrete has attai

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd