A soil sample consists of particles ranging in size from 0.6 mm to 0.02 mm. The average exact gravity of the particles is 2.66. Verify the time of settlement of the coarsest and finest of these particles through a depth of 1 metre. Suppose the viscosity of water as 0.001 N-sec/m2 and the unit weight as 9.8 kN/m3.
what are tie lines? explain in detail
Stone Soling: One of the early practices in road construction was to provide a stone soling 150-225 mm in thickness. The stones are laid by manual labour, and stone spalls ar
Hi Sir I have a graduation project part (A) in this semester. I have chosen topic (Analysis and design of Swimming Pool). I got this project ready from friend so I want Presented
Estimate the Activity Durations The total labor cost for emergency bridge rehabilitation on an interstate highway is $5,716,440. The average crew-hour cost is $15,879 for this
What is Bonded Post-tensioning In post-tensioned construction, ducts, in which tendons are provided, are sometimes grouted after the stressing operation. Though the mechanism
the propane gas tank has an inner diameter of 1500mm and wall thickness of 15mm. If the wall is pressurized to 2MPa, determine the absolute maximum shear stress in the wall of tank
Define Marine growth - underwater inspection of bridge? Generally, in seawater marine growth takes place. Acid generated by the marine growth attacks concrete. This can lead to
Q. Show the process of Waterproofing for bridge decks? Waterproofing materials such as membranes are applied on top of bridge deck surface since: (i) Vehicular traffic (f
Q. Formation of pedestrian level winds around buildings? When a building blocks the wind blowing across it, part of the wind will escape over the top of the building. Some will
A continuous wall footing, 1 m wide, rests on sand, the water table lying at a great depth. The corrected N-value for the sand is 10. Verify the load which the footing can support
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd