Question

While design life will it be same as return period for design situations?


Answer

Design life means least duration a structure is accepted to last. Longer is design life; so higher is cost of a project. So, while choosing design life for a structure, engineers have to consider design life that generates an economical project without sacrificing necessary function.

During selection of return period of convinced design conditions, winds, waves. One should think consequences of exceedance. In reality, there are usually no extreme maximum values of these plan conditions and its variety is based on probability of exceedance that is related to return time.

So, design life might not be like to return time of design conditions while their ranges are based on diverse considerations.

 


Related Discussions:- Return period for design situations

General requirement for civil engineering, Question General requirement for...

Question General requirement for Civil Engineering Works in 1992 Edition, Clause 15.09 details that tying wires for strengthening adjacent to and above Class F4 and F5 closes must

Geotech, for zero air void line sr is

for zero air void line sr is

Theodolite, definion of local attraction and correction

definion of local attraction and correction

What is the absolute maximum shear stress, A strip load of considerable len...

A strip load of considerable length and 1.5 m width transmits a pressure of 150 kN/m 2 to the underlying soil. Verify the maximum principal stress at 0.75 m depth below the footin

Explain the runoff, Explain the Runoff RUNOFF: Flowing water from preci...

Explain the Runoff RUNOFF: Flowing water from precipitation or snow melt which travels overland by gravity to a depression, stream or other body of water.

Effects of sewer sediment on hydraulic performance, Q. Effects of sewer sed...

Q. Effects of sewer sediment on hydraulic performance? The presence of sediment in sewers has contrary effects on the hydraulic performance of sewers. In case of sewage flow ca

Shallow foundations, The drainage system of a cantilever wall shown in Figu...

The drainage system of a cantilever wall shown in Figure As 1 became blocked after a heavy rainstorm and the groundwater level, which was originally below the base, rose to1.5 (m)

Tests on bricks, Tests on Bricks The following laboratory tests can be...

Tests on Bricks The following laboratory tests can be conducted on the bricks to find their suitability: 1.    Crushing strength 2.    Absorption 3.    Shape and size

Contractor to continue concreting works, Question If on-site slump test fai...

Question If on-site slump test fails, is it necessary that engineers allow a contractor to continue concreting works ? Answer This is an extremely traditional question raised by

State the short-term deflections, State the short-term deflections If  ...

State the short-term deflections If  short-term deflections are considered, the instantaneous deflection due to design loads may be calculated using elastic analysis based on t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd