Direction of approaching velocities of ships during berthing, Civil Engineering

Assignment Help:

Q. Direction of approaching velocities of ships during berthing?

One of the key effects of angle of approaching velocities of ships is its influence of energy to be absorbed by fender system. Consider several ships berth on same pier at the same speed though with different angle of approach however their kinetic energies are the same, amount of energy absorbed by fender differs. Amount of energy absorbed by fender is:

W = 0.5mv2(k2+ r2 cos2?) / (k2+ r2)

Where W= energy absorbed by the fender

  m= mass of the ship

  v=velocity of the ship

  k= radius of gyration of the ship

  r= distance of centre of gravity of the ship to the point of contact of the fender

  Φ=direction of velocity

Henceforth when direction of approaching velocity of a ship is normal to fender system (i.e. Φ=90) amount of energy absorbed is smaller when compared with that of a ship whose velocity is tangential to the shoreline.


Related Discussions:- Direction of approaching velocities of ships during berthing

Fluid mechanics , i have three civil engineering fluid mechanics. 1 manomet...

i have three civil engineering fluid mechanics. 1 manometer problem 2 estimate the discharge for a channel 3 pipe system - direction of flow in line and what the value of flow in l

Warm mix asphalt., how it different from hot mix asphalt . is it changes an...

how it different from hot mix asphalt . is it changes any performance compared to hot mix asphalt

Use of stone aggregates in road construction, Use of Stone Aggregates in Ro...

Use of Stone Aggregates in Road Construction Stone aggregates are extensively used in roads in pavement layers. They are obtained from natural rock. The following geological

Design Mix M35/C35, What is the actual mix propotion for M35/ C35 design mi...

What is the actual mix propotion for M35/ C35 design mix concrete

Principle of adding cooling pipes, Question What is key principle of a...

Question What is key principle of adding cooling pipes or yet using cold water for concrete in concreting operation? Answer These methods aim at reducing placing tem

Tack rivet, tack rivet figures with connections

tack rivet figures with connections

Levelling, what is the types of levelling

what is the types of levelling

#civil, what is whole circle barring

what is whole circle barring

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd