Determine the cubic yard in the ground, Civil Engineering

Assignment Help:

An earthwork contractor encountered a location within the borrow area where the geological conditions changed.  Instead of encountering 100 cubic yards of wet clay, the contractor excavates 100 cubic yards of loose sand and clay having a bank density of 3,400 pounds per cubic yard and a loose density of 2,700 pounds per cubic yard. A ton of this material will occupy nearly how many cubic yards in the ground? and, in the truck?

Solution:

Two-thousand pounds of this material would occupy 0.59 (2000 / 3400 = 0.59) cubic yard in the ground and 0.74 (2000 / 2700 = .74) cubic yard in the truck. This results in a swell factor of 26%. The contractor will have to haul 126 cubic yards of this material for every 100 cubic yards in the ground.


Related Discussions:- Determine the cubic yard in the ground

Minimisation of differential settlement, Minimisation of Differential Settl...

Minimisation of Differential Settlement You are aware that differential settlement causes more distress to the structure, when compared with that of total settlement. The var

Explain the dupuit equations for unconfined aquifers, Explain the Dupuit Eq...

Explain the Dupuit Equations for Unconfined Aquifers   Using natural log: Q = ΠK((h 2 ) 2 - (h 1 ) 2 )/ln(r 2 /r 1 )  Using log 10 :   Q = K((h 2 ) 2 - (h 1 ) 2 )/((1055)l

Define the design of piers and abutments erected in water, Define the Desig...

Define the Design of Piers and Abutments Erected in Water? All piers and abutments erected in water are generally designed to be protected from scour or erosion.  However, both

What are the applications of modulus of elasticity, As the term implies, "M...

As the term implies, "Modulus of Elasticity" shows to the elasticity or "flexibility" of a material. The value of modulus of elasticity is very much important relating to deflectio

Vacancy for teaching?, I am a civil engineer and interested to teach.Is the...

I am a civil engineer and interested to teach.Is there any vacancy?

Geotech, soil sample investigation

soil sample investigation

P.h.e, procedure for designing of sewage scheme

procedure for designing of sewage scheme

Serveying, Set out horizontal and vertical cintrol and small building for c...

Set out horizontal and vertical cintrol and small building for construction work?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd