Geotechnical Instrumentation is often employed for monitoring state of reclamation. From time to time two piezometers are installed inside same borehole. What is main motive after this?


Answer

For standpipes, they usually contain one plastic tube between its intention is to test water level only. Though, for piezometers, they are used for measuring pore water pressure in certain intensity below ground. For case, if there are two clayey layers below ground at unlike depths, many piezometer including two part piezometers might be sunk at same borehole to determine pore water pressure at these layers respectively. This pact has pro that it saves cost of installation of separate boreholes for quite a few piezometers. Still, installation of multiple piezometers within same borehole is affected by incidence of leak the length of pipes

 


Related Discussions:- Monitoring state of reclamation

Use of primers in joint sealant, Q. Use of primers in joint sealant? Mo...

Q. Use of primers in joint sealant? Most of the joint sealants applied in concrete joints are adhesive and recommended joint width/depth of joint sealant is from 2:1 to 1:1 as

Cavities under structures., This is the title for my thesis for masters in ...

This is the title for my thesis for masters in structural engineering. Is it possible to make for me the literature review? I already have my references.

Shrinkage of concrete in prestressed members, Shrinkage of concrete in pres...

Shrinkage of concrete in prestressed members The shrinkage of concrete in prestressed members results in a shortening of ensioned wires and hence contributes to the loss of st

Matlab program, for calculating the bending moment in which the loading and...

for calculating the bending moment in which the loading and the length of continuous beam is taken from the user

Determine the cost of compensation, The soil in a borrow pit has a void rat...

The soil in a borrow pit has a void ratio of 0.90. A fill-in-place volume of 20,000 m 3 is to be constructed with an in-place dry density of 18.84 kN/m 3 . If the owner of borr

Foundation, write the types of foundation for black cotton soil and exxplin...

write the types of foundation for black cotton soil and exxplin with drowing?

Benefits of analysis of prestress and bending stresses, Normal 0 ...

Normal 0 false false false EN-IN X-NONE X-NONE

Number of segments for segmental linings in tunnelling, Q. Number of segmen...

Q. Number of segments for segmental linings in tunnelling? For the construction of tunnels by segmental linings, choice of the number of segments affects the durability and cos

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd