Design of prestressed concrete pipes, Civil Engineering

Assignment Help:

Design of prestressed concrete pipes

The design of prestressed concrete pipes should cover the following five stages :

(a) Circumferential prestressing, winding with or without longitudinal prestressing,

(b) Handling stresses with or without longitudinal prestressing,

(c) Condition in which a pipe is supported by saddles at extreme points with full water load but zero hydrostatic pressure,

(d) Full working load conforming to the limit state of serviceability, and

(e) The first crack stage corresponding to the limit state of local damage.

 


Related Discussions:- Design of prestressed concrete pipes

Bitumen tests, discussion of each bitumen test, its significance and import...

discussion of each bitumen test, its significance and importance in understanding and working with bitumen

Determine the statement about construction earthwork, Which of the followin...

Which of the following statements about construction earthwork are true: I.  The volume of earth known in its natural state is known as bank-measure; in-situ; in-place; virgin

Project management, know the planking and strutting for shallow excavation...

know the planking and strutting for shallow excavation

Weigh batching, measurement of gauge box for sand ?

measurement of gauge box for sand ?

Foundations, Design a footing of a bridge pier

Design a footing of a bridge pier

Problems in turbid water - underwater inspection of bridge, Define Problems...

Define Problems in turbid water - underwater inspection of bridge? There are three main problems, which limit the viewing performance of an underwater camera. These are: -

Numericals on settlement of foundation, A footing foundation for a water to...

A footing foundation for a water tower carries a load of 9000 kN and is 3.6 metres square. It rests on dense sand of 9 m thickness overlying a clay layer of 3 metres depth. The cla

What is material at site return, Q. What is Material at site Return? Th...

Q. What is Material at site Return? The authority is executive charge of a work should be responsible for holding in safe custody for controlling the consumption and to the ext

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd