Q. What is Material at site Return?
The authority is executive charge of a work should be responsible for holding in safe custody for controlling the consumption and to the extent prescribed here in after for the correct accountal of all materials at site of such work also for the return to stores transfer or disposal other wise to the best advantage of the railway of any material at site which it appears certain will not be consumed on that work.
As material are issued for consumption on the work the date quantity and sub head to which they are chargeable should be recorded under issued but found subsequently to be surplus to requirements should be brought back into record as minus issue such transactions should where ever practicable be avoided by continue issue to exact and immediate requirement or by recording then only when actually consumed.
Material at site returned to stores transferred or other wise disposed and shown in their respective records with the date Qty and disposal reference as minus receipts.
EXPLAIN THE USE OF INTERPOLATION IN CREATING CONTOUR LINE
design of beams latteraly supported
differentiate between components and resolved parts
Define Truss analysis-stability Identify whether a truss is determinate or indeterminate. Identify if the truss is stable or unstable m = number of membe
1. Draw the projections of a line AB that is 50 mm long and is parallel to both the HP and the VP. The line is 40 mm above the HP and 25 mm in front of the VP. 2. A line AB, 50 mm
tell me something about velocity profile?
Explain the Operating Point - Pumping System Intersection of the characteristic curve and the system curve. This is the head and flow rate data for the pump "operation". The op
Q. Formation of pedestrian level winds around buildings? When a building blocks the wind blowing across it, part of the wind will escape over the top of the building. Some will
Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/
distribution of shear stress in triangular section
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd