What is material at site return, Civil Engineering

Assignment Help:

Q. What is Material at site Return?

The authority is executive charge of a work should be responsible for holding in safe custody for controlling the consumption and to the extent prescribed here in after for the correct accountal of all materials at site of such work also for the return to stores transfer or disposal other wise to the best advantage of the railway of any material at site which it appears certain will not be consumed on that work.

As material are issued for consumption on the work the date quantity and sub head to which they are chargeable should be recorded under issued but found subsequently to be surplus to requirements should be brought back into record as minus issue such transactions should where ever practicable be avoided by continue issue to exact and immediate requirement or by recording then only when actually consumed.

Material at site returned to stores transferred or other wise disposed and shown in their respective records with the date Qty and disposal reference as minus receipts.


Related Discussions:- What is material at site return

Builiding, how to bulid a bilding?

how to bulid a bilding?

Determine about the hard-drawn steel wires, Determine about the Hard-drawn ...

Determine about the Hard-drawn steel wires Hard-drawn steel wires which are indented or crimped are preferred for pre-tensioned members as their bond characteristics are superi

Distomat, short note about characteristics of distomat

short note about characteristics of distomat

Geo Technical Project, I have a geo technical Project that I need to be sol...

I have a geo technical Project that I need to be solved correctly and accurately within 15 hours exact, please. Steps and details must be included. Thanks a lot and let me know ASA

Determine the probable period of time, A clay stratum is 4.5 m thick and re...

A clay stratum is 4.5 m thick and rests on a rock surface. The coefficient of consolidation of a sample of this clay was found to be 4.5 × 10-8 m 2 /s in the laboratory. Verify pro

Computer programming, compare 2 numbers and print either the message identi...

compare 2 numbers and print either the message identifying the greater than number(or) the message starting that both number are equal

Break even point, Break even point: EM Electricals, Inc., contains fix...

Break even point: EM Electricals, Inc., contains fixed costs of Rs. 600,000 this period. Variable costs involved labour charges of Rs.100 per unit and material cost of Rs. 200

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd