Design approach for the spacing of min-piles, Civil Engineering

Assignment Help:

Design approach for the spacing of min-piles

For close spacing of min-piles, it would provide substantial cost savings with reduction of pile cap size. Though close spacing of piles implies the problem of group effect that tends to decrease the load carrying capacity of every pile member. Notwithstanding this, there is well established rule that govern the minimum spacing of piles it implies for friction piles such as mini-piles, centre-to-centre spacing must not be less than the perimeter of the pile.


Related Discussions:- Design approach for the spacing of min-piles

Asdasd, #questiasdasdasdasdon..

#questiasdasdasdasdon..

Determine stability of the upstream slope of an earth dam, Stability of the...

Stability of the upstream slope of an earth dam Give the step by step procedure for examining the stability of the upstream slope of an earth dam by the Swedish method of slice

Preloading - control of settlements, Q. Preloading - Control of settlements...

Q. Preloading - Control of settlements? This method consists of loading the soil strata by a load intensity which will be equal to or higher than the expected load intensity. T

Define seismic isolation bearings - bridge bearing, Define Seismic Isolati...

Define Seismic Isolation Bearings  - Bridge Bearing? Many bridges had been built before the proper seismic design specifications were known to us. These bridges require strengt

Topographical survey and preparation of drawings, Topographical Survey and ...

Topographical Survey and Preparation of Drawings: Topographical Survey for a road project consists of three sequential stages: (a) Reconnaissance Survey, including a study

Cross section diagram of urban road, cross section diagram of urban roan in...

cross section diagram of urban roan in embankment,in cut,in eight lane,in conjusted area,divided hihgway

Introduction to engineering mechanics, Deternim the angle A for which the m...

Deternim the angle A for which the moment of the 500N force is maximum about a point o. also find the maximum momentum

Method of construction of a bored cast-in-situ concrete pile, Q. Method of ...

Q. Method of construction of a bored cast-in-situ concrete pile? Ans. - Bored cast-in-situ concrete pile - A guide casing of 3 to 4 m length is provided on top of the bore hole

Advantages associated with this kind of material, Question In pumping s...

Question In pumping stations one of choices for the material of water tanks is fibre-reinforced plastic. What are main advantages associated with this kind of material? An

Fore bearing, find out the interior angleS with diagrame LINE AB, BC, CD, D...

find out the interior angleS with diagrame LINE AB, BC, CD, DE, EA Fore bearing 60''30" , 122'' , 46'' , 205''30" , 300''

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd