Problems in turbid water - underwater inspection of bridge, Civil Engineering

Assignment Help:

Define Problems in turbid water - underwater inspection of bridge?

There are three main problems, which limit the viewing performance of an underwater camera. These are:

- Absorption

- Refraction

- Reflection

Absorption reduces the amount of illuminating light that reaches the object from the light source.  It also reduces the amount of light reaching the camera from the object.  This combined absorption of light limits the maximum distance between the camera and the object.  The viewing range is proportional to the power of the light source, and the light sensitivity of the camera used.

The process of refraction causes dispersion of light from the light source across a larger area than would occur in clear water, thus reducing the intensity of the light beam. The light coming back from the subject to camera is also reduced and scattered in a similar fashion causing loss of contrast and image detail in the video signal.

Reflection is probably the most critical factor for the performance of cameras in turbid water. The suspended particles in the path of illuminating light reflect a portion of the illuminating light directly back into the camera.

This backscatter, can often be limiting factor in the use of underwater visual imaging system in turbid water.  The illuminating light reflected back from the suspended particles tends to "swamp" the imaging light from the subject.

 


Related Discussions:- Problems in turbid water - underwater inspection of bridge

Explain the erosion and sedimentation, Explain the Erosion and Sedimentatio...

Explain the Erosion and Sedimentation Erosion: Removal of soil or other channel material caused by the rapid movement of water over the channel surface. The removed material

Digit of cells for concrete box girder bridges, Question How does an engine...

Question How does an engineer determine digit of cells for concrete box girder bridges ? Answer If depth of a box girder bridge exceeds 1/6 or 1/5 of bridge width, then it is o

Highway, what is the difference between bitumin and asphalt

what is the difference between bitumin and asphalt

Washer – necessary for bolts, Q. Washer – necessary for bolts? 'Fastene...

Q. Washer – necessary for bolts? 'Fastener' is a general term which is used to describe something that is used as a restraint for holding things together or attaching them to o

Back fill behind the abutments of bridges, Q. Back fill behind the abutment...

Q. Back fill behind the abutments of bridges? Dry Rubble - At the bank of all bridge abutments and wing walls, the space next to the masonry is to be filled in by a hand-pack

Moment distribution method hinges, Analyse the continuous beam using moment...

Analyse the continuous beam using moment distribution. A continuous beam ABCDE fixed at A carry a load of 2KN one metre from A at AB 3m. BC 3m, carry a UDL of 3KN/m and hinge at

Foundations, Design a footing of a bridge pier

Design a footing of a bridge pier

Define creep settlements, Creep occurs (secondary compression) after consol...

Creep occurs (secondary compression) after consolidation settlements. We defined consolidation settlement, as that compression during which excess pore pressure exists in the strat

Maximum shear stress , the propane gas tank has an inner diameter of 1500mm...

the propane gas tank has an inner diameter of 1500mm and wall thickness of 15mm. If the wall is pressurized to 2MPa, determine the absolute maximum shear stress in the wall of tank

Bulking of sand, what is the permissible limit of sand

what is the permissible limit of sand

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd