Define Problems in turbid water - underwater inspection of bridge?

There are three main problems, which limit the viewing performance of an underwater camera. These are:

- Absorption

- Refraction

- Reflection

Absorption reduces the amount of illuminating light that reaches the object from the light source.  It also reduces the amount of light reaching the camera from the object.  This combined absorption of light limits the maximum distance between the camera and the object.  The viewing range is proportional to the power of the light source, and the light sensitivity of the camera used.

The process of refraction causes dispersion of light from the light source across a larger area than would occur in clear water, thus reducing the intensity of the light beam. The light coming back from the subject to camera is also reduced and scattered in a similar fashion causing loss of contrast and image detail in the video signal.

Reflection is probably the most critical factor for the performance of cameras in turbid water. The suspended particles in the path of illuminating light reflect a portion of the illuminating light directly back into the camera.

This backscatter, can often be limiting factor in the use of underwater visual imaging system in turbid water.  The illuminating light reflected back from the suspended particles tends to "swamp" the imaging light from the subject.

 


Related Discussions:- Problems in turbid water - underwater inspection of bridge

Find the size of the foundation required, A steam turbine with base 6 m × 3...

A steam turbine with base 6 m × 3.6 m weighs 10,000 kN. It is to be placed on a clay soil with c = 135 kN/m 2 . Find the size of the foundation needed if the factor of safety is to

#Paint, whats the mix ratio or proportion of paint components for 1litre

whats the mix ratio or proportion of paint components for 1litre

Glazed tiles for construction material, Q. Glazed tiles for Construction Ma...

Q. Glazed tiles for Construction Material? Glazed tiles are only meant for dadoes of bath room, Toilet and kitchens etc as they have no strength . Normally 8'' x 4'' g

Determine the term - final tension, Determine the term - Final Tension ...

Determine the term - Final Tension The tension in tendons after losses of prestress have taken place is called as final tension. Final tension is taken to be corresponding  to

States of stress - principal stresses, States of stress - principal stresse...

States of stress - principal stresses: Now let us consider a few cases of solids of the similar material (mild steel) under various states of stress as display in Figure. The

RefConc Triangle Section''s bending stress, When I use allowable stress des...

When I use allowable stress design, how can I get depth of N.A and resultant force of Compression at triangle section? It''s Reinforced Concrete...

How to determine the water content and bulk density, The wet weight of a sa...

The wet weight of a sample is missing in a Proctor test. The oven-dry weight of this sample is 189 N. The volume of the mould used is 1000 cm 3 . If the degree of saturation of

Steel, sir i want to know that which pages of IS800:2007 is used for steel ...

sir i want to know that which pages of IS800:2007 is used for steel design of tension member, compression member, collumn, beam, connections, trusses etc.. please give me the topic

Stochastic calculus, Consider a market with one stock and one money market ...

Consider a market with one stock and one money market account, with the same assumptions on parameters (such as r, µ and s 2 ) as in the derivation of the Black-Scholes formula giv

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd