Q. Design Control Room for plant?

Some equipment may need to be located inside buildings, but this needs to be justified as it incurs additional cost and can create additional hazards. Typically, buildings are used where the process, equipment, materials or activities are sensitive to exposure of various kinds (e.g. heat, cold, moisture, contamination, damage, or noise).

Since ventilation in a building is generally less than that outdoors, a leak of flammable or toxic material tends to disperse more slowly and a hazardous concentration is more likely to build up. Also, if an explosion occurs, the blast pressure generated tends to be much higher and result in more damage.

Ventilation and/or dust collection systems are required in enclosed storage buildings as well to assist with removal of mobile equipment exhaust and any off-gassing from the product, and minimize dust.

All occupied buildings need to be located away from process areas, upwind of flare, vent and fired equipment, and outside of blast overpressure contours to protect personnel in the event of vapor release, fire or explosion.

Building design and orientation should also address environmental considerations such as prevailing weather direction (wind, dust, rain, snow) and provide adequate shelter for entrances. Car parks shall cater for all site personnel required during normal operation, taking into account shift working and visitors. Shelters may be required in severe climates.


Related Discussions:- Design control room for plant

Determine the largest value of force, Do not round intermediate calculation...

Do not round intermediate calculations; however for display purposes report intermediate steps rounded to four significant figures. Give your final answer(s) to three significant f

Explain working of steam sampling, Q. Explain working of Steam Sampling? ...

Q. Explain working of Steam Sampling? Sample coolers shall be supplied by the Vendor. A common sample spillage trough shall also be provided by the Vendor, with a cover screen

Thermodynamics, can u please explain me d concept of 2nd law of thermodynam...

can u please explain me d concept of 2nd law of thermodynamics. I am not so sure about it ??

Refrigeration cycle, 1.5kw/ton of refrigeration is required to maintain tem...

1.5kw/ton of refrigeration is required to maintain temp of -40c in the refrigerator.if the cycle works on carnot cycle.determine 1.cop,2.sink temp 3. heat rejejected to the sink/to

Explain general phase of radial drilling machine, General Phase of Radial D...

General Phase of Radial Drilling Machine Steps- 1. Prepare a strong foundation for the value study. In radial drilling machine hole can not be produce in any angle.

Define the advantages of electro discharge machining, Define the Advantages...

Define the Advantages of Electro discharge machining 1. The surface finish obtained is very good. 2. This process can be used for any hard material. 3. Materials likes ca

Spring, what is the geometry of a leaf spring

what is the geometry of a leaf spring

Gradual engagement-various factors in clutch design , Gradual Engagement : ...

Gradual Engagement : The clutch should positively take the drive gradually without the occurrence of sudden jerks.

When was pddi developed, When was PDDI developed The PDDI interface was...

When was PDDI developed The PDDI interface was developed in connection with the ICAM project which was funded by the Air Force in order to improve the manufacturing methods in

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd