Design a water supply scheme for new railway colony, Civil Engineering

Assignment Help:

Q. Design a water supply scheme for new Railway colony based on the following data's.

i. Requirement of Loco and domestic consumption 5 lacs gallon per day.

ii. Source of water river 1 mils away.

iii. Level difference between in take level of jack well and ground level of over head tank in the colony is 50 feet.


Related Discussions:- Design a water supply scheme for new railway colony

Widening on curves, Widening on Curves: Pavements have to be widened ...

Widening on Curves: Pavements have to be widened on curves because of the fact that : (a) the vehicle has a wheel base and overhang on the front and rear, and the vehicle

Graduate, fabrication methods of ironmongery

fabrication methods of ironmongery

Explain plate jig, Explain Plate jig 1) The major parts of this jig is ...

Explain Plate jig 1) The major parts of this jig is plate from which it takes its name other necessary parts and drill bush and locating pins. 2) Plate jigs are general for

Engineering economics, Ask quA contractor has both a 3-cy and a 5-cy shovel...

Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 worki

Rcc lintel, how to make a leakproof joint with existing lintel

how to make a leakproof joint with existing lintel

Pre-stressing work, Under which situation shall engineers use jacking in ag...

Under which situation shall engineers use jacking in agreement end only and from both ends in pre-stressing work?

Categories of losses of prestress, Categories of losses of prestress We...

Categories of losses of prestress We may put various losses in either of two categories : Losses which take place during transfer of  prestress and those which take place after

What is the correct value of the specific gravity, In a specific gravity te...

In a specific gravity test, 1.17 N of oven-dired soil was taken. The weight of pyknometer, soil and water was obtained as 6.51 N. The weight of pyknometer full of water alone was 5

Design the drainage pipes system in reclamation areas, Q. Design the Draina...

Q. Design the Drainage pipes system in reclamation areas? In reclamation areas drainage pipes are generally laid at flatter gradients when compared with upstream stormwater pip

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd