What are main problems related with prestressed concrete piles?


Answer

Origin of Daido piles comes from Japan where these prestressed actual piles are used as substitute plies. Holes are preformed in position and Daido piles are located inside these preformed holes with subsequent grouting of void gap between piles and neighbouring ground. Though, in Hong Kong Daido piles are constructed by driving into ground by hammers instead of originally designed replacement means. A fitting means of Daido piles is changed, construction troubles like twisting of pile tip shoes, crushing of concrete at pile tip and so on.

 


Related Discussions:- Main problems related with prestressed concrete piles

Hydraulics, In this question we consider a bended outlet of pipe flow AB. E...

In this question we consider a bended outlet of pipe flow AB. End A is attached to an incoming pipe by a flange connection. The pipe diameter at A is the same as the incoming pipe,

Geotechnical engineering, Explain coulomb''s wedge theory-definition and de...

Explain coulomb''s wedge theory-definition and derivation

Process to calculate the initial tension, Process to calculate the Initial ...

Process to calculate the Initial Tension The maximum stress induced in the prestressing tendon at the time of the stressing operation is known as initial tension in tendons. T

Effective span, what do u mean by effective span and its derivation?

what do u mean by effective span and its derivation?

Calculate surface loading rate for each clarifier, A wastewater plant is op...

A wastewater plant is operating at 10MGD with a suspended solids concentration of 200mg/L. It has 6 clarifiers operating in parallel. Each clarifier is 40 foot in diameter and 10 f

Concrete mixers, what do you mean by buttering mixers

what do you mean by buttering mixers

Application of levelling, how do I draw sections(longitudinal and cross sec...

how do I draw sections(longitudinal and cross sections)?

Two pegs test, the distance between two pegs M and N is 7,063 as measured o...

the distance between two pegs M and N is 7,063 as measured on a slope. the height measured on the pegs are that M=1.814M and N=0.5687M

Rcc and rbc, types mixing,curing,water cement ratio,qualities and workabili...

types mixing,curing,water cement ratio,qualities and workability

Hoyers long line system pre-tensioning, Hoyers long line system pre-tension...

Hoyers long line system pre-tensioning When concrete attains the required strength,  jacks  are released and tendon wires in-between various units are cut.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd