Main problems related with prestressed concrete piles, Civil Engineering

Assignment Help:

Question

What are main problems related with prestressed concrete piles?


Answer

Origin of Daido piles comes from Japan where these prestressed actual piles are used as substitute plies. Holes are preformed in position and Daido piles are located inside these preformed holes with subsequent grouting of void gap between piles and neighbouring ground. Though, in Hong Kong Daido piles are constructed by driving into ground by hammers instead of originally designed replacement means. A fitting means of Daido piles is changed, construction troubles like twisting of pile tip shoes, crushing of concrete at pile tip and so on.

 


Related Discussions:- Main problems related with prestressed concrete piles

Ranging, defference between direct and indirect ranging..

defference between direct and indirect ranging..

State the term - stresses from concrete to reinforcement, State the term - ...

State the term - Stresses from concrete to reinforcement Stresses from concrete to reinforcement, or vice-versa, in reinforced concrete are transferred due to bond between conc

Compute the included angles, Example. With a surveyor compass the ang...

Example. With a surveyor compass the angles observed in traversing the lines AB, BC, CD, DE and EF are  as. Compute the included angles and indicate them in a neat sketch.

Fly levelling, what is meant by fly levelling and when it is carried out ?

what is meant by fly levelling and when it is carried out ?

IRC Class AA loading in existing industrial areas, For IRC Class AA loading...

For IRC Class AA loading in existing industrial areas, what is load (kN/m) has to applied base don the wheel loads. especially raft foundation & roads are at same level.

Guidelines for selection of site, Guidelines for Selection of Site: Th...

Guidelines for Selection of Site: The following are some of the guidelines for selecting the site of a bridge : (a) A site which is on a straight reach of the river is pref

Maintenance of earth roads, Maintenance of Earth Roads: The main task...

Maintenance of Earth Roads: The main task in maintaining the earth road is to ensure that cross-section is intact and is free from rutting, depressions and corrugations, and

Solid mensuration, Ask question #MiniThe base of an isosceles triangle and ...

Ask question #MiniThe base of an isosceles triangle and the altitude drawn from one of the congruent sides are equal to 18cm and 15cm, respectively. Find the lengths of the sides o

Calculate the modulus of elasticity of concrete, Calculate the Modulus of e...

Calculate the Modulus of elasticity of concrete A pre-stressed concrete beam, having a cross-section of 150 mm width and 400 mm depth, is used over a span of 8 m. Straight tend

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd