Main problems related with prestressed concrete piles, Civil Engineering

Assignment Help:

Question

What are main problems related with prestressed concrete piles?


Answer

Origin of Daido piles comes from Japan where these prestressed actual piles are used as substitute plies. Holes are preformed in position and Daido piles are located inside these preformed holes with subsequent grouting of void gap between piles and neighbouring ground. Though, in Hong Kong Daido piles are constructed by driving into ground by hammers instead of originally designed replacement means. A fitting means of Daido piles is changed, construction troubles like twisting of pile tip shoes, crushing of concrete at pile tip and so on.

 


Related Discussions:- Main problems related with prestressed concrete piles

Surveying, what are the basic two division of surveying

what are the basic two division of surveying

Biodiversity, actual meaning of it? Is it a unit to measure the functions o...

actual meaning of it? Is it a unit to measure the functions of enviroment?

Calculate concrete yield in cubic feet per sack of cement, Calculate the Co...

Calculate the Concrete Yield in Cubic Feet per Sack of Cement A concrete mix design is 1: 1.9: 2.8 by weight.  The water cement ratio is 7 gallons of water per sack.  The aggre

Show ph value of water, Q. PH Value of Water? It is a symbol for hydrog...

Q. PH Value of Water? It is a symbol for hydrogen ion concentration and indicates acidity or alkalinity. When P H Value more than 7 water is alkaline and less than 7 water is a

Explain the shrink factor of soil, Explain the Shrink Factor of Soil In...

Explain the Shrink Factor of Soil In addition to the swell factor and its associated load factor, soil also has a shrink factor. While the first two relate the volume of an equ

Stabilised pavement layers, Stabilised Pavement Layers: Soil stabilis...

Stabilised Pavement Layers: Soil stabilisation is the process of treating a soil in such a manner as to alter and improve its properties for use as a pavement layer on sub-gr

Cost effective buildings, How to construct Semi Ellitical Buildings of 15fe...

How to construct Semi Ellitical Buildings of 15feet dia., in Brick Masonry.

#titl, Two readings ie 1.64m and 0.73m were taken during leveling procedure...

Two readings ie 1.64m and 0.73m were taken during leveling procedure to define the slope of a centerline of a bridge at points A and B. If distance AB=50 m, find the slope of line

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd