Q. How to evaluate quality of Bricks?
1. Clour -Deep red, Carry red, Copper red, colour is indication of uniform burning and also suggests quality of clay used. Over brunt bricks has bluish while under brunt bricks are dull red in clour, yellow clour in brick indicates presence of magnesium oxide.
2. Shape - Perfectly rectangular with opposite faces parallel to each other and adjacent faces at right angles. Bricks shall have all edges sharp, broken or blunt edges should not exist.
3. Size -Permissible variation of ± 3mm in length, width & thickness for Ist class bricks. For IInd class bricks this variation will be permitted up to ± 5 mm in length & width and ± 2 mm. In thickness. In IIIrd class bricks permissible variation is ± 6 mm in all direction.
Wet Mix Macadam: For heavily trafficked highways, the granular bases are constructed using Wet Mix Macadam (WMM). The WMM is a specification in which well graded aggregate is
how to compute the compound elements particularly outstanding element of compression flange if 2-ismb300 are placed side by side
How does the knife edge load simulate the existing condition of the bridge structure?
Question What is major difference between "hammer efficiency" and "coefficient of restitution" at what time using Haley's formula in pile driving? Answer Hammer ef
types of cement
Shear distribution for I section
The local survey crew measures a distance of 1,135 ft of new drainage pipe that is required for the new road construction. The beginning point for the drainage is located at statio
According to National Building Code (Sp:7 1970), the differential settlement shall be kept within the limits to which the superstructure can accommodate itself without harmful dist
Define Deferred maintenance - underwater inspection of bridge? Many problems of the substructure can be traced to lack of any maintenance in time, which again can be due to lac
Question In General Specification for Civil Engineering Works, designing of roadbase material is based on recipe approach. Give reason. Answer Designing of roadbase
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd