Loss of prestress due to creep of concrete, Civil Engineering

Assignment Help:

Loss of prestress due to creep of concrete

Creep of concrete means time dependent deformation of concrete. Its effect depends upon the interval of  time for which the member is loaded. For instance, suppose a concrete member is subjected to an external load which causes a deformation. If  the member remains loaded for a long time it is seen that the deformation increases without any increase of  load due to creep.

 


Related Discussions:- Loss of prestress due to creep of concrete

Determine about the prestressed concrete, Determine about the prestressed c...

Determine about the prestressed concrete In prestressed concrete the most important parameter is the prestressing force. Ifthe prestressing force reduces with time, prestresses

Premix, how we can do good premix

how we can do good premix

Loading and unloading cycles for soil nails, In carrying out pull-out tests...

In carrying out pull-out tests for soil nails, it generally requires the unloading and loading of soil nails of several cycles up to 80% of ultimate tensile strength of soil nails.

BUILDING CONSTRUCTION, GIVE IN DETAIL THE TREATMENT OF TOP SURFACE OF EARTH...

GIVE IN DETAIL THE TREATMENT OF TOP SURFACE OF EARTH FILLING..

Key functions of changed components of paint, Question What are key fun...

Question What are key functions of changed components of paint? Answer For regular paint application, there are largely three key components of paint, namely primer, u

Gts bench mark, Gts bench mark in thane district maharashtra

Gts bench mark in thane district maharashtra

State active earth pressure behind a vertical wall, With the aid of Mohr's ...

With the aid of Mohr's circle diagram describe what means by active and passive Rankine states is in a cohesionless soil with a horizontal surface. As obtain an expression for the

State the laws governing compaction of cohesion less soils, a) What are th...

a) What are the laws governing compaction of (i) cohesion less soils like sand and (ii) moderately cohesive soils like sandy clay ? b) To what compaction pressure does the

Fore bearing, find out the interior angleS with diagrame LINE AB, BC, CD, D...

find out the interior angleS with diagrame LINE AB, BC, CD, DE, EA Fore bearing 60''30" , 122'' , 46'' , 205''30" , 300''

Define equipments required for conducting uwmt, Define Equipments required ...

Define Equipments required for conducting UWMT? Equipments required for conducting UWMT are: Inspection Equipment: a) Electronic yoke with power cable b) Ground fault interr

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd