Define the statements about error analysis, Civil Engineering

Assignment Help:

Define the statements about error analysis?

I.  The expected value (or: most likely; probable value) of a measurement is the value that has the highest value of being correct.

II.  The most probable values are the observed values corrected by an equal part of the total error.

III.  Measurements of a given quantity are assumed to be normally distributed. 

IV.  The interval between the extremes is known as the 50% confidence interval.

V.  The probable error of a quantity that has a mean [ μ ]  and a standard deviation [ s ] represents that the probability is 50% (or; confidence interval) that a measurement of that quantity will fall within the range of   μ ± 0.6745 s or the probable ratio of precision is  μ / 0.6745 s.

 


Related Discussions:- Define the statements about error analysis

Determine the flow rate from the dewatering well, A construction project in...

A construction project involves excavation below grade. A 24 inch diameter dewatering well is installed from grade (EL 586) to 80 ft below grade to lower the water table. Soil bori

Measurement of surface runoff and infiltration, Surface runoff travelling o...

Surface runoff travelling over ground surface to reach receiving water involves the following events: i) Rainfall intensity exceeds soil's infiltration rate; ii) Excess water

Steel structure, what do mean by outstand element of compression flange, in...

what do mean by outstand element of compression flange, internal element of compression flange and web general

Construction equipments, what is preventive maintenance and state its advan...

what is preventive maintenance and state its advantages

Steel report, Are you capable to do me 6 pages steel report in 48 H ?

Are you capable to do me 6 pages steel report in 48 H ?

Flow diagram of wet process, what type of basin in which is stored and wha...

what type of basin in which is stored and what is silos what is channel and correcting basins what type of clinker is formed

Forces reactions at that point, Mad/Sir What would be the Horizontal and ve...

Mad/Sir What would be the Horizontal and vertical component from this acting force see diagram

Rehabilitation of Concrete Roads, Step by step rehabilitation strategies wi...

Step by step rehabilitation strategies with drawing, figures, and illustrations

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd