Define the statements about error analysis, Civil Engineering

Assignment Help:

Define the statements about error analysis?

I.  The expected value (or: most likely; probable value) of a measurement is the value that has the highest value of being correct.

II.  The most probable values are the observed values corrected by an equal part of the total error.

III.  Measurements of a given quantity are assumed to be normally distributed. 

IV.  The interval between the extremes is known as the 50% confidence interval.

V.  The probable error of a quantity that has a mean [ μ ]  and a standard deviation [ s ] represents that the probability is 50% (or; confidence interval) that a measurement of that quantity will fall within the range of   μ ± 0.6745 s or the probable ratio of precision is  μ / 0.6745 s.

 


Related Discussions:- Define the statements about error analysis

Mr Kamal Saxena, What is WBM road. How it is constructed?

What is WBM road. How it is constructed?

Unreinforced concrete pavement function without mesh, Question How can ...

Question How can it would be able for unreinforced concrete pavement function without mesh reinforcement ? Answer Concrete carriageway, it is usually classified into t

Maintenance of concrete roads, Maintenance of Concrete Roads: The mai...

Maintenance of Concrete Roads: The main defects that show up in a concrete road are : (a) cracks (b) loss of sealant (c) spalling at joints (d) loss of texture

Geofabric strengthening of perth soils, I need technical assistance. The pr...

I need technical assistance. The project is incomplete. I need someone to proofread it. Do you have someone who know Plaxis, Slope/W and Flac?. Can you arrange a case study for Geo

Survey, Methods of orientation,Principles of resection

Methods of orientation,Principles of resection

Cutting edge in well foundation, Q. Cutting edge in well foundation? Th...

Q. Cutting edge in well foundation? The function of cutting edge on well foundation is basically to cut through the earth which being sunk. The angle of well curb pushes the ea

Determine the term- shrinkage of concrete, Determine the term- Shrinkage of...

Determine the term- Shrinkage of Concrete Shrinkage of concrete is primarily due to gradual loss of moisture which results in change in volume. The shrinkage of concrete depend

Estimate the minimum electric power, The sketch shows a common consumer pro...

The sketch shows a common consumer product called Water Pik. This device uses a motor to drive a piston pump that produces a jet of water (diameter d = 3 mm, temperature T = 10 °C)

Coatings at the back faces of abutments, Q. Coatings at the back faces of a...

Q. Coatings at the back faces of abutments? There are many views on the necessity of application of protective coatings (can be in the form of two coats of paint) to the back f

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd