Define the statements about error analysis, Civil Engineering

Assignment Help:

Define the statements about error analysis?

I.  The expected value (or: most likely; probable value) of a measurement is the value that has the highest value of being correct.

II.  The most probable values are the observed values corrected by an equal part of the total error.

III.  Measurements of a given quantity are assumed to be normally distributed. 

IV.  The interval between the extremes is known as the 50% confidence interval.

V.  The probable error of a quantity that has a mean [ μ ]  and a standard deviation [ s ] represents that the probability is 50% (or; confidence interval) that a measurement of that quantity will fall within the range of   μ ± 0.6745 s or the probable ratio of precision is  μ / 0.6745 s.

 


Related Discussions:- Define the statements about error analysis

Analyse the state of stress, Analyse the state of stress: For the cros...

Analyse the state of stress: For the cross-section shown in above figure, let us take b = 100 mm, d = 300 mm and M = 9 × 10 7 N mm and Q = 18 × 10 4 N and analyse the state

Manage civil work design, Ask question #Minimum 1Make a detailed list of al...

Ask question #Minimum 1Make a detailed list of all constraints and requirements to the bridge design00 words accepted#

Shallow foundations, The drainage system of a cantilever wall shown in Figu...

The drainage system of a cantilever wall shown in Figure As 1 became blocked after a heavy rainstorm and the groundwater level, which was originally below the base, rose to1.5 (m)

Determine the interdependent phases of investigation, Determine the interde...

Determine the interdependent phases of investigation The following are the interdependent phases of investigation: i)  Stratigraphical survey, ii) Physical survey, and

Determine the cost of compensation, The soil in a borrow pit has a void rat...

The soil in a borrow pit has a void ratio of 0.90. A fill-in-place volume of 20,000 m 3 is to be constructed with an in-place dry density of 18.84 kN/m 3 . If the owner of borr

What do you mean by ggbs – cement replacement, Q. What do you mean by GGBS ...

Q. What do you mean by GGBS – cement replacement? From structural point of view GGBS replacement enhances higher durability, lower heat of hydration and higher resistance to su

Breakwaters - harbour layout, Breakwaters: A breakwater is an artific...

Breakwaters: A breakwater is an artificial structure constructed in the sea to protect ships from the effect of waves and storms. Three types of breakwaters are common :

Estimating movement for movement joints, Question Should reversible moi...

Question Should reversible moisture movement be taken into account in estimating movement for movement joints ? Answer Size of concrete is affected by changes in dist

Solid block -calculating for design mix, Good evening sir, solid block''s d...

Good evening sir, solid block''s design mix calculated generally please explain and derive .

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd